User’s Manual for SM5C Straight Line Glass Edging Machine
(866) 583-1377 Sommer & Maca Machinery Division of C. R. Laurence Co. • crlaurence.com • (800) 421-6144
1
Contents
Description ----------------------------------------------------------------------------------- 5
Specification --------------------------------------------------------------------------------- 5
Installation and Operation ------------------------------------------------------------------ 6
Maintenance ---------------------------------------------------------------------------------- 9
Electrical System ---------------------------------------------------------------------------- 9
Packing List --------------------------------------------------------------------------------- 10
Tools ------------------------------------------------------------------------------------------ 11
Electrical Schematics ----------------------------------------------------------------------- 1
3
Reference Drawings/Figures --------------------------------------------------------------- 1
5
Quick Start Guide -
Step-by-Step guide to machine set-up
1.
Uncrate machine (examine for damage)
2.
Check for parts missing (see parts list and diagrams in back of this manual)
3.
Position Machine Body in place (see Fig. 7,14)
4.
Install leveling feet on main Body and adjust for level (page 6)
5.
Install and level ingoing conveyor (see Fig. 10)
6.
Install and level outgoing conveyor (see Fig. 10)
7.
Install Roller Racks (see Fig.6)
8.
Position coolant tank
9.
Connect coolant hoses and fill tank (page 7 and Fig 11.)
10.
Connect electrical power per local codes (page 6)
11.
Check motor rotation. Should be rotating clockwise viewed from above motor
If you encounter any problems, or have questions about setting up or operating the machine,
call the parts and service department at (866) 583-1377
or 773-242-3260