16
Creotech Instruments S.A.
tel. +48 22 233 10 27
ul. Gen. L. Okulickiego 7/9
e-mail: [email protected]
05-500 Piaseczno, Polska www.creotech.pl
3.2
Schedule
IP Power Strip lets you program weekly actions for each of the sockets.
Week scheduler can be found in Scheduler tab. To set the action for the socket you must first check
the Active checkbox in outlet tab that you want to set up. You can set two action for each socket per
day. Possible actions are: turning on, turning off and toggle the state of socket.
For example, if socket named “Router” should turn on Mondays at 8:00 and turn off at 16:00 on
Friday, then the fields should be set as shown in the picture below.