
4
‐
23
Hydraulic
top
clamps
The
top
clamp
device
composed
of
two
clamps
is
installed
on
the
saw
bow
and
on
top
of
the
rear
vise
before
executing
bundle
cutting.
Refer
to
Using
Top
Clamp
for
Bundle
Cutting
for
operating
procedure
on
bundle
cutting.
Height
encoder
With
this
optional
device,
the
operator
can
input
work
piece
width
via
HMI
touch
panel.
When
cutting
begins
and
the
blade
starts
to
descend,
the
panel
will
display
the
current
blade
height,
the
blade
descend
speed
and
the
cutting
rate
calculated
by
the
system.
The
encoder
is
a
high
‐
precision
electronic
device.
It
has
been
factory
‐
adjusted
before
shipment.
Please
do
not
make
any
random
change
to
it.
Avoid
high
impact
on
the
device.
Summary of Contents for C-620NC
Page 2: ......
Page 8: ......
Page 13: ...1 5 Illustration Emergency Stop Emergency Stop Button...
Page 17: ...1 9 Illustration Safety Labels...
Page 22: ...2 4 FLOOR PLAN Machine top view Machine front view...
Page 23: ...2 5 Machine side view...
Page 24: ......
Page 34: ......
Page 67: ...5 1 Section 5 ELECTRICAL SYSTEM ELECTRICAL CIRCUIT DIAGRAMS...
Page 68: ...5 2...
Page 69: ...5 3...
Page 70: ...5 4...
Page 71: ...5 5...
Page 72: ......
Page 73: ...6 1 Section 6 HYDRAULIC SYSTEM HYDRAULIC CIRCUIT DIAGRAM...
Page 74: ...6 2...
Page 80: ......
Page 92: ...10 1...
Page 93: ...10 2...
Page 94: ...10 3...
Page 95: ...10 4...
Page 96: ...10 5...
Page 97: ...10 6...
Page 98: ...10 7...
Page 99: ...10 8...
Page 100: ...10 9...
Page 101: ...10 10...
Page 102: ...10 11...
Page 104: ...10 13...
Page 105: ...10 14...
Page 106: ...10 15...
Page 107: ...10 16...
Page 108: ...10 17...
Page 109: ...10 18...
Page 110: ...10 19...
Page 111: ...10 20...
Page 112: ...10 21...
Page 113: ...10 22...
Page 114: ...10 23...
Page 115: ...10 24...
Page 116: ...10 25...
Page 117: ...10 26...
Page 120: ......
Page 121: ......