90
REAR RIGHT TARGET GRAIN
FRONT RIGHT TARGET GRAIN
FRONT LEFT TARGET GRAIN
REAR LEFT TARGET GRAIN
After target assembly it is required to perform the Target Calibration on the new target.
TOP OF THE CLAMP
FRONT RIGHT-REAR RIGHT
TOP OF THE CLAMP
FRONT LEFT-REAR LEFT
GEO 15 Service Manual - Rel. 0
2
0
6
-2016
Summary of Contents for GEO 15
Page 1: ...3D WHEEL ALIGNER GEO 15 SERVICE MANUAL UK...
Page 2: ......
Page 65: ...64 Package content GEO 15 Service Manual Rel 02 06 2016...
Page 66: ...65 The rails are already assembled GEO 15 Service Manual Rel 02 06 2016...
Page 68: ...67 2 Match the holes in this way GEO 15 Service Manual Rel 02 06 2016...
Page 76: ...75 Electrical Wiring GEO 15 Service Manual Rel 02 06 2016...
Page 101: ......