E. CHECKOUT and STARTUP
The Checkout and Startup procedure prepares a recently installed or repaired COMBI for
operation. The procedures check proper electrical, gas, water, and drain connections to the
COMBI, and verify basic COMBI operation.
Table 2-5 Installation Check List
TASK
REFERENCE COMPLETED
Page No.
Preparation
Check operating location clearances
9
Test
supply
water
quality
11
Verify Electric Power Requirements.
10
Verify Gas Supply Requirements
16
Verify Exhaust Hood Requirements
18
Installation
Check
Exhaust
Hood
18
Check electrical line connection
10
Check
water
supply
connection
11
Leak Test water supply lines
11
Check
Gas
Supply
Connection
16
Leak Test Gas Supply Connection
16
Verify
Combi
is
level
20
Check
drain
line
connection
14
Perform
Burner
Ignition
Test
23
Perform
Startup
Test
23
Notes: