
82
GB
Bend the four metal lugs on the top edge of the lower section of
the chimney frame inwards and upwards. Then screw the upper
section in place.
LEK
180°
LEK
Övre skorstensram
Nedre skorstensram
LEK
Startrör
Avtätningsplåt
Isoleringsskiva
Övre startrör
Stoppbricka
Övergångsisolering
Skorstensmodul
Check to ensure that the stove-body is standing straight and
perpendicular. Slide the flue base over the collar. Make sure that the seal
round the collar is not dislodged. If further sealing material is required,
heat-resistant sealant may be used.
When using a Premodul chimney system, attach the sealing plate and
insulating panel to the start pipe. Cut out the knockout from the sealing
plate and fold the four tabs down slightly. Move the upper start pipe down
through the sealing plate with all four tabs trailing against the outside of
the pipe. Insert the upper start pipe down in the start pipe and check that
the four tabs are against the outside of the upper start pipe and on the
upper edge of the start pipe (see enlarged image). Install the insulating
panel, stop washer, transitional insulation and chimney module.
For different chimney systems, the sealing plate can be screwed to the
rear panel and the insulating panel laid on top.
Chimney frame -
upper section
Chimney frame -
lower section
Chimney module
Stop washer
Insulating panel
Upper start pipe
Sealing plate
Start pipe
Transitional insulation