background image

Key to symbols and safety instructions 

4

 

Type of roof

Roof connection

Roman tiles

Sheet metal, corrugated sheets

Slate/shingle/plain tile

Tab. 1  Roof connection

2.2  Collector

The vacuum tube collector has six twin-wall glass tubes with 
vacuuminsulated interiors. A temperature sensor is installed 
on each collector which is accessible after the cover [6] is 
removed.

TUBO C (with 
reflector)

TUBO T (without 
reflector)

Collector angle

greater than 24°

less than 25°

Tab. 2  Recommended use

6720816962-03.1ST

4

5

6

2

3

1

Fig. 1  TUBO II C 

[1] CPC (not in TUBO II T); [2] Pipe register; [3] Vacuum tube; 

[4] Collector connection, flow (hot, red transport protection); 

[5] Collector connection, return (cold, blue transport protec-

tion); [6] Access to the collector temperature sensor

6720816962-06.1ST

2

3

5

4

1

Fig. 2  Collector hydraulic system and data plate

[1] Data plate on the outside of the collector casing; [2] Pipe 

register; [3] Flow to the cylinder [4] Collector temperature 

sensor, pre-mounted; [5] Return from the cylinder

Summary of Contents for TUBO II C

Page 1: ...Low weight with 18 kg T and 18 kg C Modular system needs based fields through small modules that can be optically connected to a field Low space requirement on the roof High reliability through prove...

Page 2: ...ting the roof hooks with roof tiles 16 6 4 Fitting special roof hooks for slate shingles 17 6 5 Fitting double ended screws on sheet metal roofs 17 6 6 Fitting double ended screws on corrugated roofs...

Page 3: ...tors and the installation material may cause burns when exposed to solar radiation Protect the collectors and installation material from solar exposure Store the collectors in dry conditions if stored...

Page 4: ...T without reflector Collector angle greater than 24 less than 25 Tab 2 Recommended use 6720816962 03 1ST 4 5 6 2 3 1 Fig 1 TUBO II C 1 CPC not in TUBO II T 2 Pipe register 3 Vacuum tube 4 Collector c...

Page 5: ...sion mbar V l h 6720816963 40 1 ST 0 50 100 150 200 250 300 350 400 0 10 20 30 40 50 60 70 Fig 4 Collector pressure drop measured with heat transfer medium LS at 50 C Product data for energy consumpti...

Page 6: ...ector and the snow guard or Regularly clear snow build up Other applicable instructions and important information The installation and maintenance instructions for the solar pump station include vital...

Page 7: ...ion with expansion vessel temperature and safety equipment 3 Solar cylinder 4 Solar controller 2 6 Scope of delivery Check that the delivered material is complete and undamaged 2 6 1 Collector install...

Page 8: ...r clamp 2 4 4 6 4 Horizontal profile rail3 2 2 2 2 2 5 Vertical profile rail 1704 mm 2 2 3 2 3 6 Roof hook4 4 6 7 Profile rail joiner 2 2 8 Anti slip protector 2 4 6 4 6 Tab 5 Number of components per...

Page 9: ...plicable in Germany for the instal lation of collectors Rooftop installation DIN 18338 VOB Part C1 Roof covering and roof sealing work DIN 18339 VOB Part C Plumbing work DIN 18451 VOB Part C Scaffoldi...

Page 10: ...ffolding 5 Before installation 5 1 General Notes WARNING Risk of burns due to hot parts If the collector and installation material are ex posed to solar exposure for prolonged periods of time they may...

Page 11: ...ayout and orientation 1 Collector temperature sensor always in the collector to which the flow has been connected 2 Return cold from the storage tank blue transport protection 3 Flow hot to the storag...

Page 12: ...ntain the minimum clearance to the edge of the roof dim a a a b 10 a 10 b h h a a 6720816962 15 1 ST E a C Fig 20 Dimension a in accordance with DIN EN 1991 1 4 Dim a Either formula can be used The lo...

Page 13: ...talling the roof connection DANGER Risk to life by falling from roof Whilst working on the roof take all necessa ry precautions against a possible fall If there are no general anti fall safety devices...

Page 14: ...ble ended screw G1 Standard version for 1 collector G2 Standard version for 2 collectors G3 Standard version for 3 collectors E2 Expansion for 2 collectors E3 Expansion for 3 collectors 6 2 Mounting r...

Page 15: ...Fig 27 Fig 27 6720813331 07 1ST 5 mm 8x90 DIN EN 14592 60x100 mm Fastening of the roof hook with 8 x 90 DIN EN 14592 If this is not possible a board with a thickness of min 5 cm can be screwed onto t...

Page 16: ...of hooks Position the roof hook centrally on the roof tile The bottom part then lies on the rafter boards planks Tighten nut 1 when the serrated washer 2 grips the teeth of the bottom part of the roof...

Page 17: ...lock 2 M12 nut 3 Sealing washer 4 M12 double ended screw 5 Sleeve on site 6 Washer 6 6 Fitting double ended screws on corrugated roofs DANGER Risk to life through brea thing in fibres containing asbes...

Page 18: ...nded screw Corrugation height dim Y dim Z 35 mm 70 mm 40 mm 65 mm 45 mm 60 mm 50 mm 55 mm 55 mm 50 mm 60 mm 45 mm Tab 9 Dimensions 7 Fitting the profile rails The profile rails must be installed at on...

Page 19: ...ignment Screw the horizontal profile rails with a 5 mm Allen key and screw M8 onto the vertical profile rails 6720816962 17 1ST Fig 42 Connecting profile rails with screw and rivet net Align sides of...

Page 20: ...tter footing on roofs and or to slide up individu al roof tiles 6720816962 46 1ST Fig 45 Do not stand on the collector The plastic parts on the collector tensioners do not have any support function Th...

Page 21: ...3 Fig 49 Fasten the first collector Remove the transport packaging on the rear 6720816963 32 1ST Fig 50 Remove the transport packaging 8 1 3 Inserting a double sided collector clamp Place the collecto...

Page 22: ...Fig 54 Fastening the double sided collector clamp CAUTION Risk of injury and leaks through escaping solar heat transfer medium as a result of unsecured plu gin connectors Secure hydraulic collector c...

Page 23: ...e collector NOTICE Collector damage through leaks The direct connection of rigid pipework to the collector is not permissible Make the hydraulic connection of the collec tor to the pipework with flexi...

Page 24: ...rature of over 120 C at 2 bar Form CON SOLARSTATION 2 5 bar Commission the solar thermal system in accordance with the details in the solar pump station installation and maintenance instructions 10 2...

Page 25: ...38 1ST T15 1 2 click 3 Fig 62 Install the end caps in this case same side connection 10 5 Insulating the connection lines and pipework Thermally insulate the pipework in the entire solar circuit in a...

Page 26: ...g Whilst working on the roof take all necessa ry precautions against a possible fall If there are no general anti fall safety devices available wear personal protective equipment Drain the pipework Un...

Page 27: ...pipework insulation carried out 24 6 Visually inspect the glass tubes Cleaning in the case of severe contamination 26 7 Visually inspect the drain holes in the collector profile Clean if water cannot...

Page 28: ...r Solare Energiesysteme GmbH Kasseler Stra e 1a 60486 Frankfurt Gewerbestra e 7 79539 L rrach Fon 49 0 7621 42228 500 Fax 49 0 7621 42228 31 info consolar de www consolar com nderungen und Irrtum vorb...

Reviews: