35
Cork gasket
Inlet elbow
Hose clamp
Gas pressure regulating valve
Flexible gas pipe
Combustion air blower
13. Reconnect the flexible gas pipe to the gas pressure regulating valve and tighten the coupling.
14. Fix the inlet elbow with the hose clamp to the venturi manifold.
15. Reconnect the hose between the air pressure switch and the inlet elbow.
16. Reconnect the electrical cables to the gas pressure regulating valve and the air pressure switch.
17. On multiple burner units repeat steps 4 to 16 for each gas valve assembly.
18. Carry out a leakage test (Refer to instructions in 5.5.2).
19. Turn power to unit back on and initiate a test fire sequence to check for proper ignition character
istics.
20. If tests are acceptable, affix appropriate conversion label to data plate. Close door panel(s) and
secure with the brackets. Then, return unit to normal operation.
21. Conversion is now complete.
Hose to
pressure switch
Pressure switch
Venturi manifold
gas pipe connection
O-ring
Summary of Contents for GS 120 OC
Page 2: ......
Page 69: ...69 Notes...
Page 70: ...Notes...
Page 71: ...Condair Ltd Printed in Switzerland Technical modifications reserved...