5.4
Water installation
All installation work must be carried out in accordance with the
locally applicable water
installation regulations
.
All work concerning the water installation must be performed only by
adequately qualified
personnel
(e.g. plumbers).
Warning - danger of electric shock!
For all installation work, the Condair GS...OC
must be
disconnected from the mains supply
and
secured against unintentional reconnection
.
5.4.1 Performing the water installation
Overview water installation
1 Filling water connection BSP 1/2" (outside thread)
2 Water drain connection 3/4"
3 Shut-off valve (installation recommended, building side)
4 Auxiliary water drain connection BSP 1/2" (inside thread)
5 Filter valve (accessory “Z261”)
6 Filling water supply line (min. inner ø: 12 mm)
7 Manometer (installation recommended, building side)
8 Pressure reducing valve (compulsory for water
pressures >8 bar, building side)
9 Auxiliary drain line BSP 1/2", building side
10 Drain line BSP 3/4", building side
11 Funnel (building side, min. height 15 cm)
12 Siphon (min. inner ø: >45 mm, building side)
5
6
7
8
1
min. 15 cm
9
12
10
11
2
3
4
Summary of Contents for GS 120 OC
Page 2: ......
Page 69: ...69 Notes...
Page 70: ...Notes...
Page 71: ...Condair Ltd Printed in Switzerland Technical modifications reserved...