MCDD-100 MetaCarrier Detection Device
Revision 3
Rear Panel Connectors and Pinouts
MN-MCDD100
3–9
3.5.2.2 AC Operation (Standard) – Replacing Fuses
FOR CONTINUED OPERATOR SAFETY, ALWAYS REPLACE THE FUSES WITH THE
CORRECT TYPE AND RATING.
The MCDD-100 uses two 20mm Slow-blow fuses – one each for line and neutral connections.
The fuses are contained within a fuse holder that is press-fit into the body of the IEC power
module (Figure 3-7).
Figure 3-7. AC Fuse Replacement
To replace the fuses:
DISCONNECT THE POWER SUPPLY BEFORE PROCEEDING!
•
First, unseat the fuse holder from the IEC power module.
o
Use the slot to pry the holder outward from the IEC power module.
o
Pull the holder straight out, and then swing the holder away from the module.
•
Then, remove and replace the fuses as needed.
o
Use T2A fuses for standard operation.
•
Finally, re-seat the fuse holder in the IEC power module.
Summary of Contents for MetaCarrier MCDD-100
Page 8: ...MCDD 100 MetaCarrier Detection Device Revision 3 Table of Contents MN MCDD100 viii BLANK PAGE ...
Page 30: ...MCDD 100 MetaCarrier Detection Device Revision 3 Installation MN MCDD100 2 6 Notes ...
Page 86: ...MCDD 100 MetaCarrier Detection Device Revision 3 Appendix A MN MCDD100 A 8 Notes ...
Page 87: ......
Page 88: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX ...