LPOD-R Outdoor Amplifier / Block Up Converter (BUC)
MN-LPODR
Appendix B
Revision 3
B–11
Step Task
7
Re-install the fan shroud onto the chassis – Make sure to keep the fan
power supply cables clear of the fan and heat sink surfaces. Then, re-
install all screws as described in Step 2, making sure to re-install the four
longer screws at their same locations.
Torque the screws to 8 ±1 inch lbs.
8
Reconnect the power source to the LPOD-R.
Figure B-14. LPOD-R PS 1.5 Shroud Screw Locations