+7 (800) 777-83-75(звонок бесплатный)
5.9
Checking suction valve
In order to access the intake valve, the air filter has to be removed in accordance with
section 5.5.
Then open the air throttle by hand, ensuring that it has a smooth stroke and can be opened fully.
If the air throttle jams or
doesn’t
operate fully, then replace the valve with a new one.
5.10
Servicing bearings of electric motor
When the compressor is used, fresh viscous lubricant (formulated for rolling bears) should
be added to the
motor’s
bearings.
Lubricant should be added using a special syringe for viscous lubricants through lubricators
accommodated in the
motor’s
bearing caps.
The volume of lubricant added can be calculated using the formula:
D2
motor shaft
(
mm
)
х
0,005 =
М
(lubricant mass)
(
g
).
Do not over-lubricate the bearings beyond the standard level as all excess lubricant will be
squeezed out of the bearings into the motor when the motor is running.
6.
Fault handling
6.1
Faults and corrective actions
Problem
Possible faults
Corrective actions
The compressor starts up with
lag. There is a slow build up in
the electric
motor’s
speed.
The belt is overtightened
Tighten the belt with the rel-
evant load.
The oil is thick.
Replace the oil.
There’s
a whistling during the
compressor’s
operation.
The belt is slipping.
Tighten the belt with the appro-
priate tensile force (see section
5.3 Checking drive belt).
The compressor won’t start.
There’s a temperature block on
the control
unit’s
display.
The ambient air temperature in
the facility does not meet the
required temperature (below
+5
°C
or above +40
°C).
Ensure the necessary ambi- ent
air temperature where the com-
pressor is installed.
The compressor is overheating.
There’s
insufficient ventilation in
the facility where the compres-
sor is installed.
Increase the air circulation
inside the facility.
The oil level is too low.
Top up oil.
The radiator is dirty
Blow down the radiator with
compressed air.
29
Summary of Contents for 11100061
Page 61: ...7 800 777 83 75 www v p k ru A3008 Comprag Comprag 61...
Page 63: ...7 800 777 83 75 www v p k ru A3008 1 1 1 1 2 63...
Page 64: ...7 800 777 83 75 www v p k ru A3008 1 2 3 Comprag 4 5 6 1 3 1 2 3 4 64...
Page 65: ...7 800 777 83 75 www v p k ru A3008 5 6 7 8 9 10 11 12 1 4 65...
Page 66: ...7 800 777 83 75 www v p k ru A3008 1 2 3 4 5 6 90 A 7 8 1 5 66...
Page 67: ...7 800 777 83 75 www v p k ru A3008 1 2 3 4 5 6 7 8 1 3 9 9 10 11 12 13 14 15 16 67...
Page 70: ...7 800 777 83 75 www v p k ru A3008 2 4 2 3 4 5 3 6 8 13 6 16 6 15 14 13 14 2 5 2 5 3 4 70...
Page 75: ...7 800 777 83 75 www v p k ru A3008 3 4 3 5 5 25 3 5 1 1 2 1 2 75...
Page 76: ...7 800 777 83 75 www v p k ru A3008 3 5 2 2 6 3 4 4 1 30 A55 pro Log 76...
Page 77: ...7 800 777 83 75 www v p k ru A3008 LEDs 4 1 1 LED 4 2 LCD 77...
Page 78: ...7 800 777 83 75 www v p k ru A3008 4 7 14 7 14 78...
Page 81: ...7 800 777 83 75 www v p k ru A3008 4 4 10 LCD 5 5 1 TO 1 TO 2 TO 3 TO 2 500 2000 4000 6000 81...
Page 82: ...7 800 777 83 75 www v p k ru A3008 6000 2 3 2000 5 2 1 5 2 5 3 82...
Page 84: ...7 800 777 83 75 www v p k ru A3008 2 2 1 1 2 1 5 4 2 5 5 1 2 5 5 84...
Page 85: ...7 800 777 83 75 www v p k ru A3008 5 6 5 6 4 3 2 1 2 2 5 3 4 5 7 2 5 7 85...
Page 86: ...7 800 777 83 75 www v p k ru A3008 5 8 90 5 8 5 9 5 5 5 10 D2 0 005 86...
Page 87: ...7 800 777 83 75 www v p k ru A3008 6 6 1 5 3 5 3 5 40 5 2 5 8 13 13 7 7 1 20 35 85 7 2 87...