21
Section 5
Testing with the D5-PF
To perform actual testing, the D5-PF should be connected to the EUT as shown in the standard which the EUT is
being tested to. See figures 11 and 12 are examples of the MegaPulse D5-PF connections for testing parameters of
IEC60601. They can be used as a key for the inputs and outputs of the MegaPulse D5-PF. Note the actual connections
on the front panel of the D5-PF have been added to Figure 50 of IEC 601for illustrative purposes. Make sure to confirm
your specific circuit connections based on the standard the EUT is being tested to verify your test connections are
correct.
Figure 11. Example of D5-PF Connections on Figure 50 of IEC60601
Summary of Contents for MegaPulse D5-PF
Page 1: ......
Page 2: ......
Page 5: ...iii Cleaning 26 Calibration Information 26 Technical Assistance 27...
Page 6: ...iv...
Page 16: ...10 Figure 2 Controls Indicators Connectors MegaPulse D5 PF Rear Panel...
Page 23: ...17 Figure 7 Y1 Y2 Test Output...