Table of Contents
Initial Setup .................................................................................................................... 2
An Introduction to Dielectric Withstand Testing with the HT-10KVDC................................... 3
Leakage Test .................................................................................................................. 3
High Voltage Dielectric Withstand Test ........................................................................ 3
High Voltage Discharge .................................................................................... 4
Introduction .................................................................................................................... 5
Specifications ................................................................................................................. 5
Operation..................................................................................................................................... 7
Setting up the HT-10KVDC........................................................................................... 7
AC Line Voltage Requirements ..................................................................................... 7
Fuse Replacement .......................................................................................................... 7
Front and Rear Panel Features ....................................................................................... 8
Initial Checkout Procedure............................................................................................. 13
Setting up the HT-10KVDC for Laboratory Testing ..................................................... 13
Factory Settings................................................................................................. 14
Adjustment of the Leakage Current Level ........................................................ 14
Adjustment of the High Voltage Ramp Time ................................................... 15
Adjustment of the High Voltage Level ............................................................. 15
Adjustment of the High Voltage Test Duration ................................................ 15
Setting the Voltage Ramp Switch ..................................................................... 16
Setting the Test Timer Switch........................................................................... 16
Setting the Failure Shutdown Switch................................................................ 16
Operating Techniques .................................................................................................... 16
Daily Operation Test ......................................................................................... 17
Testing Products................................................................................................ 17
Test results ........................................................................................................ 18
Hipot Pass............................................................................................. 18
Red LED/Buzzer .................................................................................. 18
Technical Assistance................................................................................................................... 21
Maintenance and Calibration ...................................................................................................... 22
Service Information........................................................................................................ 22
General Maintenance ..................................................................................................... 22
Calibration Access ............................................................................... 22
Cleaning ............................................................................................................ 23
Performance Test ........................................................................................................... 23
Operation/Lamp Function Test ......................................................................... 23
Calibration Procedure..................................................................................................... 24
Meter Calibration Adjustment .......................................................................... 24
Summary of Contents for HT-10KVDC
Page 2: ......
Page 4: ......
Page 6: ......
Page 14: ...9 Figure 3 1 Controls Indicators Connectors HT 10KVDC Front Panel...
Page 16: ...11 Figure 3 2 Controls Indicators Connectors HT 10KVDC Rear Panel...