2022-11
A01Axxxxxx.xx | 04
33
4.
Erect the pillar and place it on the selected
location. While doing so, carefully pull the
supply lines further out of the upper
opening to avoid looping.
5.
Align the pillar at the selected position.
Check that no supply lines are crushed!
6.
Mark the hole pattern of the pillar base on
the ground.
7.
Move the pillar to the side so that the
markings on the ground are accessible.
Check that the supply lines are not twisted
or strained.
8.
Drill holes on the markings using a suitable
drilling tool.
–
Drill hole diameter: according to the
manufacturer's specification of the
ground anchor
–
Drill hole depth: according to the
manufacturer's specification of the
ground anchor
9.
Insert ground anchor according to
manufacturer's instructions. Allow injection
mortar to harden if used.
Fig. 11: Boreholes
Summary of Contents for A01AE11001.11
Page 100: ...Annexes 100 A01Axxxxxx xx 04 2022 11 13 Annexes 13 1 Housing dimensions...
Page 105: ...Annexes 2022 11 A01Axxxxxx xx 04 105 13 3 EU Declaration of Conformity...
Page 106: ...Annexes 106 A01Axxxxxx xx 04 2022 11...
Page 107: ...Annexes 2022 11 A01Axxxxxx xx 04 107...
Page 108: ...Annexes 108 A01Axxxxxx xx 04 2022 11...
Page 109: ...Annexes 2022 11 A01Axxxxxx xx 04 109...
Page 110: ...Annexes 110 A01Axxxxxx xx 04 2022 11...
Page 111: ...Annexes 2022 11 A01Axxxxxx xx 04 111 Notes...