3-14
Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide Comments:
Part Number: 236843-002 File Name: d-ch3 Hardware Options Installation.doc Last Saved On: 9/5/01 12:33 PM
4. Insert the hot-plug hard drive into the lowest available hot-plug drive
bay, and then close the ejector lever .
2
1
Figure 3-12. Inserting the hot-plug hard drive and closing the ejector lever
To remove a hot-plug hard drive, reverse steps 1 through 4.
IMPORTANT:
A hard drive blank must be installed into any empty drive bay for the
system to properly operate.