![CommScope Ruckus ICX 7750 Hardware Installation Manual Download Page 27](http://html1.mh-extra.com/html/commscope/ruckus-icx-7750/ruckus-icx-7750_hardware-installation-manual_2643846027.webp)
Ruckus ICX 7750 Switch Hardware Installation Guide
25
Part Number: 53-1003900-10
Installing the Ruckus ICX 7750
Two-post rack mount installation
NOTE
Use the following procedure when installing the Ruckus ICX 7750 in a two-post Telco rack only. If an ICX 7750 device is to be
installed into a standard four-post rack, make sure that the correct rack mount kit has been purchased. For four-post racks, follow
the procedures in
“Installing the 1U, 1.5U, and 2U Universal Kit for Four-Post Racks (XBR-R000295)”
Use the following steps to mount the Ruckus ICX 7750 in a two-post rack.
1.
Remove the rack mount kit from the shipping carton. The kit contains the following items:
•
Two L-shaped mounting brackets
•
Eight 8-32 x 5/16 in., panhead Phillips screws
2.
Attach the mounting brackets to the sides of the device as illustrated in
using the
8-32 x 5/16 in. screws.
FIGURE 12
Attaching the mounting brackets for a Ruckus ICX 7750
3.
Position the device in the rack, providing temporary support under the switch until the rail kit is secured to the rack.
4.
Attach the front right bracket to the rail rack using two 10-32 x 5/8 in. screws and the appropriate round-hole or square-hole
retainer nuts.
5.
Repeat
to attach the left front bracket to the left front rack rail and tighten all 10-32 x 5/8 in. screws to a torque of 25
in-lb (29 cm-kg). Refer to
.