ADCP-96-167 • Issue 5 • July 2016
Page 66
© 2016, CommScope, Inc.
6. Feed one of the patch cord’s two connectors through the opening at the top right
side of the swingframe, as shown in
, and pull through about 1 foot of
slack.
Figure 62. Feed Patch Cord Connector Through Swing Frame
7. Remove the ferrule dust cap from the patch cord connector and then clean the
connector as specified in the Optical Fiber Systems Cleaning and Mating
Instructions (ADCP-90-159).
8. Insert the patch cord connector into the appropriate bulkhead adapter on the first
sliding adapter pack (see
).
9. Push the first sliding adapter pack down to the closed position.
10. Route the patch cord through the fiber guideways on the outside and inside of the
swing frame as shown in
. Labels are provided that show the fiber
routing.
FEED PATCH
CORD THOUGH
THIS OPENING
PATCH CORD
ROUTING DETAIL
24334-A