ADCP-96-167 • Issue 5 • July 2016
Page 54
© 2016, CommScope, Inc.
Figure 49. Splitter Input Port Designations
Figure 50. Adapter Pack Distribution Port Designations
13. Clean the MPO connector as specified in the Multifiber-Push On (MPO) Assembly
Connector Cleaning Instructions (ADCP-96-150).
14. Repeat steps 11 through 13 for all remaining MPO cables.
15. Use a tie-wrap to hold the cable slack in place around the radius limiters and to
prevent cable pull-out as shown in
. A lance is provided for securing the
cable slack to the back of the cabinet.
A
B
C
D
24490-A
1
2
3
4
5
6
7
8
PORTS 1 - 6
PORTS 7 - 12
PORTS 13 - 18
PORTS 19 - 24
PORTS 25 - 30
PORTS 31 - 36
PORTS 37 - 42
PORTS 43 - 48
PORTS 49 - 54
PORTS 55 - 60
PORTS 61 - 66
PORTS 67 - 72
24491-B
SLIDING ADAPTER PACKS
(6 PORTS PER PACK)
1
2
3
4
5
6
7
8
9
10
11
12