![Columbia Coronado 25 Owenrs Manual Download Page 75](http://html.mh-extra.com/html/columbia/coronado-25/coronado-25_owenrs-manual_2638291075.webp)
SECTION 5
Page 30
5.15
(continued)
All shelves that are installed directly to the hull should be bonded the
full length with 3 oz. of mat and 7-1/2 oz. cloth. The bond should be on
both top and bottom of the shelves and run from 3" on the hull to 3" onto
the shelves. They can be set in place for bonding by screwing a cleat on
the fore and aft bulkheads, then setting the shelf on these and screwing
it down from the top.
Leave all sea rail and pin rail to be installed last, to keep from
scratching or gouging them. All bunks should have sea rail installed on the
inboard edges to keep the cushions from sliding off. The same applies to
the dinette seats.
The sets or drawers and doors are set into the cutouts and are drilled,
countersunk, screwed, and plugged.
Summary of Contents for Coronado 25
Page 1: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......