Getting Started
2
14
Chapter 2
Getting Started
Eon™ System Assembly
The following guide will describe in detail how to integrate the Eon™ controller into a
basic QCM configuration. The QCM depicted below is the Colnatec Tempe™ sensor head
featuring temperature control technology. If using an alternative QCM, skip the steps
highlighted in red. (See Appendix A for connection map of a fully assembled Tempe-Eon™
system).
2.
Heater Control Cable to QCM
The 4-pin LEMO™ connector
provides heater control and TC
measurement. To install, push
until it clicks in place. The other
end is a DB-15 that connects
to the DB-15 heater port on the
Eon™ deposition controller.
Connecting to QCM
1.
BNC Coaxial Cable to QCM
Spin cable in place using
cable shaft until resistance is
felt. (Twisting cable shaft past
point of resistance may
damage cable). Roll fingertip
over connector to tighten.
WARNING
Misaligned coupling of LEMO connectors can result in
severe damage to Tempe™.