035-17468-001 Rev. A (801)
6
Unitary Products Group
FIGURE 2 :
Dimensions - Downflow/Horizontal Models
B
3/4
45
A
28-1/2
2-3/4
6-1/4
35
1-3/4
5-1/4
18-1/2
3-3/4
1-1/4
20
T'STAT WIRING
7/8 K.O.
CONDENSATE
DRAIN ACCESS
3-1/4 x 3
AIR INTAKE
3-5/8 x 3-5/8
( CONN. SIZE/
PIPE SIZE)
G
GAS INLET
1-1/4 x 2-1/2
ALT. GAS INLET
1-1/4 x 2-1/2
CONDENSATE
DRAIN ACCESS
3-1/4 x 3
AIR INTAKE
3-5/8 x 3-5/8
( CONN. SIZE/
PIPE SIZE)
G
16-3/4
7-1/2
1-1/4
3-3/4
4-1/8
D
VENT CONNECTION
B
20
E
F
1-7/8
5-3/8
POWER
WIRING
7/8 K.O.
VENT CONNECTION
(VENT SIZE
19-1/4
C
A
8
H
1-3/8
MODELS
P*XD-V / G9V-DH
80/75/1200/B
120/112/2000/D
17-1/2
24-1/2
16-1/4
23-1/4
14-3/4
21-3/4
2
2 (3)
1
6-5/8
10-1/8
2-1/4
2-1/4
2
3
TOP IMAGE
RETURN END
BOTTOM IMAGE
RETURN END
FRONT
FRONT
LEFT SIDE
FRONT
RIGHT SIDE
ALL DIMENSION ARE IN INCHES, AND ARE APPROXIMATE.
1. VENT PIPE MUST BE INCREASED TO 3" ON THIS MODEL.
A
B
C
D
E
F
G
Table 2:
RATINGS & PHYSICAL / ELECTRICAL DATA - DOWNFLOW/HORIZONTAL MODELS
P*XD-V/G9V-DH
CABINET
WIDTH
(INCHES)
AFUE
1
LOW
FIRE
TEMP.
RISE °F
HIGH
FIRE
TEMP.
RISE °F
MAX.
OUTLET
AIR
TEMP. °F
BLOWER
TOTAL
UNIT
AMPS
MAX.
OVER-CURRENT
PROTECT
2
MIN WIRE SIZE
(AWG) @ 75 FT.
ONE WAY
2
OPERATING
WT. (LBS)
INPU
MBH
H/L
OUTPUT
MBH
H/L
NOM.
CFM
HP AMPS
SIZE
80/52
75/48
1200
17-1/2
92.0
35-65 35-65
165
1/2
1.7
11 x 8
12.0
20
14
128
120/78 112/72 2000
24-1/2
92.0
40-70 40-70
170
1
4.4 11 x 10 14.5
20
12
184
1.
AFUE numbers are determined in accordance with DOE test procedures
2.
Wire size and overcurrent protection must comply with the National Electrical Code (NFPA-70-latest edition).
•
For altitudes above 2,000 ft., reduce capacity 4% for each 1,000 ft. above sea level. Refer to Form 035-14460-000.
•
Wire size based on copper conductors, 60°C, 3% voltage drop.
•
Continuous return air temperature must not be below 55°F.
Table 3:
UNIT CLEARANCES TO COMBUSTIBLES
APPLICATION
TOP
FRONT
REAR
LEFT
SIDE
RIGHT
SIDE
FLUE FLOOR/BOTTOM
CLOSET
ALCOVE
ATTIC
LINE
CONTACT
UPFLOW MODELS (P*XU-V / G9V-UP)
UPFLOW
1
3
0
0
0
0
COMBUSTIBLE
YES
YES
YES
NO
DOWNFLOW / HORIZONTAL MODELS (P*XD-V / G9V-DH)
DOWNFLOW
1
3
0
0
0
0
COMBUSTIBLE
1
YES
YES
YES
NO
HORIZONTAL
1
3
0
0
0
+
0
COMBUSTIBLE
2
NO
YES
YES
YES
3
1.
Special floor base or air conditioning coil required for use on combustible floor.
2.
Minimum of 8” clearance required to install condensate removal system.
3.
Line contact only permitted between lines formed by the intersection of the rear panel and side panel (top in horizontal position) of
the furnace jacket and building joists, studs or framing.