Coleman PxXD-G9V-DH series Installation Instructions Manual Download Page 32

035-17468-001 Rev.  A (801)

32

Unitary Products Group

OPERATION AND MAINTENANCE

SEQUENCE OF OPERATION

The following describes the sequence of operation of the fur-
nace as it relates to a furnace equipped with a variable speed
blower. Refer to the schematic wiring diagram for component
location on Page 39 or 40. 

HEATING OPERATIONAL SEQUENCE

TWO STAGE THERMOSTAT

The ignition control in this furnace is unique to this product.
The control allows for a 24 volt or a 115 volt circulator input/
output. This allows for the replacement of the variable speed
motor with a multi-speed PSC motor in the event a variable
speed motor is not available at the time of servicing.
In a typical system, a call for first stage heat is initiated by
closing the W1 thermostat contacts. The inducer blower is
energized at high speed and the control waits for the low
pressure switch contacts to close. The inducer blower is
energized at low speed and the 120 VAC silicon carbide 
ignitor is powered.
At the end of the ignitor warm-up time, the first stage of the
two stage gas valve is energized (low fire). Flame must be
detected within 7 seconds. If flame is detected, the delay-to-
fan-on period begins. After the delay-to-fan-on period ends,
the circulator fan is energized at low heat speed and the air
cleaner and humidifier are energized.
A call for second stage heat (W1 and W2) after a call for first
stage heat will energize the inducer at high speed and ener-
gize the circulator at high heat speed. The circulator will ener-
gize at high heat speed after 30 seconds with a call for
second stage heat. If the furnace has been operating in first
stage heat for more than 30 seconds and the control receives
a call for second stage heat, the blower will immediately
switch to high speed. The second stage pressure switch con-
tacts will close and energize the second stage gas valve (high
fire).
If a call for second stage heat occurs at the same time as a
call for first stage heat, the second stage heat is energized
immediately after flame rectification is sensed on first stage.
When the second stage of the thermostat is satisfied, the
inducer motor is reduced to low speed and the 2nd stage gas
valve is de-energized to 1st stage. The circulator remains on
high heat speed for 30 seconds then de-energizes to low
heat speed.

When the first stage of the thermostat is satisfied, the gas
valve is de-energized and the heat delay to fan off begins tim-
ing. The inducer will postpurge for an additional 15 seconds,
then the inducer and humidifier will de-energize. Upon com-
pletion of the heat delay-to-fan-off, the circulator and air
cleaner are de-energized. Control timing, refer to (Refer to
Figure  41 on Page 33).
If flame is not detected during the trial for ignition period, the
gas valve is de-energized, the ignitor is turned off and the
ignition control goes into the “re-try” sequence.
The ”re-try” sequence provides a 60 second wait with inducer
interpurge following an unsuccessful ignition attempt (flame
not detected). After this wait, the ignition sequence is
restarted with an additional 10 seconds of ignitor warm-up
time. Two retries will be attempted before the control goes
into system lockout. If flame is established for more than 10
seconds after ignition, the ignition controller will clear the igni-
tion attempt (or retry) counter. 
If flame is detected, then lost, the ignition control will repeat
the initial ignition sequence. After 5 attempts to sustain flame,
the control will go into system lockout.
During burner operation, a momentary loss of power of 50
milliseconds or longer will de-energize the main gas valve.
When power is restored, the gas valve will remain 
de-energized and a restart of the ignition sequence will begin
immediately.
A momentary loss of gas supply, flame blowout, or a shorted
or open condition in the flame probe circuit will be sensed
within 0.8 seconds. The gas valve will de-energize and the
control will restart the ignition sequence. 
Recycles will begin and the burner will operate normally if the
gas supply returns, or the fault condition is corrected, before
the last ignition attempt. Otherwise, the control will go into
system lockout.
If the control has gone into system lockout, it may be possible
to reset the control by a momentary power interruption of one
second or longer. Refer to the FURNACE CONTROL DIAG-
NOSTICS on Page 37 of this instruction for reset information.

Summary of Contents for PxXD-G9V-DH series

Page 1: ...HORIZONTAL P XD V G9V DH 80 To 120 MBH Input 035 17468 001 Rev A 801 TABLE OF CONTENTS GENERAL INFORMATION 2 SPECIFIC UNIT INFORMATION 3 DUCTWORK 7 GAS PIPING 11 ELECTRICAL POWER CONNECTION 12 ELECTRI...

Page 2: ...n writing Also before installation the unit should be checked for screws or bolts which may have loos ened in transit There are no shipping or spacer brackets which need to be removed NOTES CAUTIONS W...

Page 3: ...dance with all national and local building safety codes and requirements or in the absence of local codes with the National Fuel Gas Code ANSI Z223 1 or CAN CGA B149 1 or 2 Installation Code latest ed...

Page 4: ...osi tion The furnace shall be located using these guidelines 1 Where a minimum amount of air intake vent piping and elbows will be required 2 As centralized with the air distribution system as possi b...

Page 5: ...ODELS P XU V G9V UH AFUE 1 LOW FIRE TEMP RISE F HIGH FIRE TEMP RISE F MAX OUTLET AIR TEMP F BLOWER TOTAL UNIT AMPS MAX OVER CURRENT PROTECT 2 MIN WIRE SIZE AWG 75 FT ONE WAY 2 INPU MBH H L OUTPUT MBH...

Page 6: ...OPERATING WT LBS INPU MBH H L OUTPUT MBH H L NOM CFM HP AMPS SIZE 80 52 75 48 1200 17 1 2 92 0 35 65 35 65 165 1 2 1 7 11 x 8 12 0 20 14 128 120 78 112 72 2000 24 1 2 92 0 40 70 40 70 170 1 4 4 11 x 1...

Page 7: ...talling the supply plenum On all installations without a coil a removable access panel is recommended in the outlet duct such that smoke or reflected light would be observable inside the casing to ind...

Page 8: ...ons Bottom Return Bottom return applications normally pull return air through a base platform or return air plenum Be sure the return plat form structure is suitable to support the weight of the furna...

Page 9: ...e into the filter rack and secure it with a sheet metal screw Refer to the unit rating plate for furnace model then see the dimensions page of this instruction for return air plenum dimensions Install...

Page 10: ...earance to the condensate trap and drain pipe A minimum of 8 clearance is required for this purpose NOTE See crawl space installation for suspending the fur nace in attic installations CRAWL SPACE INS...

Page 11: ...s tem by closing its individual external manual shutoff valve during any pressure testing of the gas supply piping system at pressures equal to or less than 1 2 psig 3 48 kpa The furnace and its indiv...

Page 12: ...equip ment ground wire must be connected to the power supply ground Remove the screws retaining the wiring box cover Route the power wiring through the opening in the unit into the junction box with a...

Page 13: ...ri ous accessories Refer to Figure 15 for connection details ELECTRONIC AIR CLEANER CONNECTION The junction box contains a clearly marked wire for connec tion to an electronic air cleaner This wire pr...

Page 14: ...ible from a swimming pool or a location where swimming pool chemicals might be stored Be sure the terminal assem bly follows the outdoor clearances listed in Table 3 for U S installations In Canada re...

Page 15: ...When selecting the location for combustion air vent termina tion the following should be considered 1 Comply with all clearance requirements as listed below 2 Termination should be positioned where ve...

Page 16: ...ation for Additional Clearance FIGURE 21 Vertical Termination OVERHANG 12 MINIMUM VENT MAINTAIN 12 CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER IS GREATER 12 SEPARATION BETWEEN BO...

Page 17: ...brought into the furnace area from outdoors It is not directly ducted into the furnace A single properly sized pipe from the furnace vent connector to the outdoors must be provided For upflow models...

Page 18: ...ed where the equipment has clearances of at least 1 inch from the sides and back and 6 inches from the front of the appli ance The opening shall communicate through a vertical or horizontal duct to th...

Page 19: ...form to ASTM Stan dards D2564 PVC or D2235 ABS 5 The use of flexible connectors or no hub connectors in the vent system is not allowed NOTE If installing furnace at altitudes between 2000 4500 ft inta...

Page 20: ...assembly procedure for the vent piping is as follows 1 Cut piping to the proper length beginning at the furnace 2 Deburr the piping inside and outside 3 Chamfer the outer edges of the piping 4 Dry fi...

Page 21: ...in a downward position Be sure to maintain 12 clearance above any insulation flooring or other COMBUSTION AIR REQUIREMENTS The ventilated attic space from which the combustion air is taken must comply...

Page 22: ...iece of flexible drain tubing such as EPDM rubber Vinyl or PVC to the nipple 5 Loop the drain tubing to provide a trap 6 Connect the discharge end of the drain tube to the con densate disposal system...

Page 23: ...4 PVC or equiva lent pipe be field installed as drain pipe The condensate piping may be tied together with the air conditioning con densate drain if the air conditioning condensate drain line is trapp...

Page 24: ...ration can continue Pressure Switches This furnace is supplied with pressure switches which monitor the flow through the combustion air vent piping system These switches de energize the ignition contr...

Page 25: ...e to call for heat 3 System start up will occur as follows a The induced draft blower motor will start at high speed and wait for low pressure switch contacts to close then switch to low speed and the...

Page 26: ...1 cubic foot dial to make a revolution with only a 120 000 Btuh furnace running Using this information locate 26 seconds in the first column of Read across to the column headed 1 Cubic Foot where you...

Page 27: ...ndant P M solenoids as well as the HI terminal 4 Remove high adjustment seal screw to expose the 3 32 set screw Refer to Figure 36 5 To increase outlet pressure turn the 3 32 set screw clockwise To de...

Page 28: ...may be the same speed or a different speed To use the same speed tap for heating and cooling the heat terminal and cool terminal must be connected using a jumper wire and connected to the desired mot...

Page 29: ...Filter Rack 6 Pack 1BR0317 External Bottom or Horizontal Filter Rack Cabinet B 1BR0321 External Bottom Filter Rack Cabinet C 1BR0324 External Bottom or Horizontal Filter Rack Cabinet D 1NK0301 Condens...

Page 30: ...cooling air flow for 60 seconds with a 15 second coast to stop ADJUSTMENT OF FAN OFF CONTROL SETTINGS This furnace is equipped with a time on time off heating fan control The fan on is fixed at 30 se...

Page 31: ...1350 745 1555 830 1540 860 C B 885 505 1280 700 1430 785 1410 820 B C 655 450 1150 620 1310 740 1300 770 D B 870 460 1230 670 1400 770 1400 800 C A 610 445 1030 555 1220 665 1220 710 D A 715 450 1120...

Page 32: ...t is satisfied the inducer motor is reduced to low speed and the 2nd stage gas valve is de energized to 1st stage The circulator remains on high heat speed for 30 seconds then de energizes to low heat...

Page 33: ...LOW INDUCER LOW STAGE PRESSURE SWITCH HSI 1ST STAGE MAIN VALVE FLAME SENSE LOW CIRCULATOR HEAT SPEED 1ST STAGE LOW PRESSURE SWITCH CLOSE RECOGNITION HSI WARM UP 17 SEC IGNITION ACTIVATION PERIOD 4 SE...

Page 34: ...be sure the filter completely covers the cabinet opening and is secured in place by the wire retainer LUBRICATION Blower and ventor motors in these furnaces are permanently lubricated and do not requi...

Page 35: ...le shooting 1 Check to see that the power to the furnace and the igni tion control module is ON 2 The manual shutoff valves in the gas line to the furnace must be open 3 Make sure all wiring connectio...

Page 36: ...100K ohms by connecting one meter lead to the motor lead and the other to an unpainted portion of the motor housing If any one of the leads fails this test THE MOTOR IS DEFECTIVE AND MUST BE REPLACED...

Page 37: ...ndicate failure status Flash sequence codes 1 thru 4 are as follows LED will turn on for 1 4 second and off for 1 4 second This pattern will be repeated the number of times equal to the code For exam...

Page 38: ...g the call for heat before locking out This may be caused by low gas pressure faulty gas valve faulty hot surface igniter reversed line polarity or burner problem 8 FLASH This fault is indicated if th...

Page 39: ...LACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 22 1 F 105 HAVING A TEMPERATURE RATING OF AT LEAST 221 C CONNECTIONS SUITABLE FOR COPPER CONDUCTORS ONLY ALL REPL...

Page 40: ...T BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 22 1 F 105 HAVING A TEMPERATURE RATING OF AT LEAST 221 C CONNECTIONS SUITABLE FOR COPPER CONDUCTORS ONLY ALL REPLACEMENT COMP...

Reviews: