Coleman PxXD-G9V-DH series Installation Instructions Manual Download Page 34

035-17468-001 Rev.  A (801)

34

Unitary Products Group

SINGLE STAGE THERMOSTAT

If a single stage thermostat is used the unit will be controlled
through the CFM Timer board timer adjustment pins (Refer to
Figure 13 on Page 13.). For the furnace to operate on High
Fire the timer jumper must be placed on the 10, 15 or 20
minute adjustment terminals. On a call for heat the unit will
operate on low fire as detailed above. If the heating require-
ments cause the cycle to exceed the jumper settings, the
high fire timer will energize the second stage heat. The sec-
ond stage operation will function as detailed above. The heat-
ing cycle will be completed in high fire operation. If the timer
jumper is in the “TIME OFF” position with a single-stage ther-
mostat, the unit will stay in low fire operation.

HOT SURFACE IGNITION SYSTEM

MAINTENANCE

AIR FILTERS

The filters should be checked periodically for dirt accumula-
tion. Dirty filters greatly restrict the flow of air and overburden
the system.
Clean the filters at least every three months. On new con-
struction, check the filters every week for the first four weeks.
Inspect the filters every three weeks after that, especially if
the system is running constantly.
All filters used with the furnace are the high velocity, clean-
able type. Clean these filters by washing in warm water.
Make sure to shake all the water out of the filter and have it
reasonably dry before installing it in the furnace. When
replacing filters, be sure to use the same size and type as
originally supplied.

UPFLOW FILTER REMOVAL AND REPLACEMENT

1.

Turn off electrical power supply to the furnace at discon-
nect switch. Remove access doors.

2.

In the blower compartment disengage the looped end of 
the filter retainer wire from the front edge of the cabinet. 
The wire will now pivot on the hinged ends at the rear of 
the cabinet. (Refer to Figure  4 on Page 8)

3.

Remove the filter and follow the cleaning instructions 
above. DO NOT remove the filter stiffener rods, if pro-
vided.

4.

When reinstalling the filter, be sure the filter completely 
covers the cabinet opening and is secured in place by 
the wire retainer.

LUBRICATION

Blower and ventor motors in these furnaces are permanently
lubricated and do not require periodic oiling.

BLOWER CARE

Even with good filters properly in place, blower wheels and
motors will become dust laden after long months of operation.
The entire blower assembly should be inspected annually. If
the motor and wheel are heavily coated with dust, they can
be brushed and cleaned with a vacuum cleaner.
The procedure for removing the direct drive blower assembly
for cleaning is as follows:
1.

Disconnect the electrical supply to the furnace and 
remove the access doors.

2.

Remove blower assembly mounting screws and slide the 
blower assembly out of the slots in the deck. If the two 
shipping screws were not previously removed, also 
remove and discard these two screws located on each 
front corner of the blower assembly.

3.

To reassemble, reverse the procedure, restore power to 
the furnace and verify operation.

BURNER AND FLAME SENSOR REMOVAL/CLEANING

The main burners and flame sensor should be checked peri-
odically for dirt accumulation or oxidation.
If cleaning is required, follow this procedure:
1.

Turn off the electrical power to the unit.

2.

Turn off the gas supply at the external manual shutoff 
valve and loosen the ground union joint.

3.

Remove the upper access panel and remove the burner 
box cover.

4.

Remove the screws that hold the burner box assembly to 
the vest panel and remove the assembly.

5.

Remove burners from the burner assembly.

6.

Burners may be cleaned by rinsing in hot water.

7.

Reassemble the burners in the reverse order.

8.

Remove the retaining screw to the flame sensor and 
remove the sensor from the burner box. Clean the flame 
sense rod with steel wool and replace.

Do not attempt to light this furnace by hand (with a
match or any other means). There may be a poten-
tial shock hazard from the components of the hot
surface ignition system. The furnace can only be lit
automatically by its hot surface ignition system.

Label all wires prior to disconnecting when servicing
controls. Wiring errors can cause improper and dan-
gerous operation. Verify proper operation after ser-
vicing.

Summary of Contents for PxXD-G9V-DH series

Page 1: ...HORIZONTAL P XD V G9V DH 80 To 120 MBH Input 035 17468 001 Rev A 801 TABLE OF CONTENTS GENERAL INFORMATION 2 SPECIFIC UNIT INFORMATION 3 DUCTWORK 7 GAS PIPING 11 ELECTRICAL POWER CONNECTION 12 ELECTRI...

Page 2: ...n writing Also before installation the unit should be checked for screws or bolts which may have loos ened in transit There are no shipping or spacer brackets which need to be removed NOTES CAUTIONS W...

Page 3: ...dance with all national and local building safety codes and requirements or in the absence of local codes with the National Fuel Gas Code ANSI Z223 1 or CAN CGA B149 1 or 2 Installation Code latest ed...

Page 4: ...osi tion The furnace shall be located using these guidelines 1 Where a minimum amount of air intake vent piping and elbows will be required 2 As centralized with the air distribution system as possi b...

Page 5: ...ODELS P XU V G9V UH AFUE 1 LOW FIRE TEMP RISE F HIGH FIRE TEMP RISE F MAX OUTLET AIR TEMP F BLOWER TOTAL UNIT AMPS MAX OVER CURRENT PROTECT 2 MIN WIRE SIZE AWG 75 FT ONE WAY 2 INPU MBH H L OUTPUT MBH...

Page 6: ...OPERATING WT LBS INPU MBH H L OUTPUT MBH H L NOM CFM HP AMPS SIZE 80 52 75 48 1200 17 1 2 92 0 35 65 35 65 165 1 2 1 7 11 x 8 12 0 20 14 128 120 78 112 72 2000 24 1 2 92 0 40 70 40 70 170 1 4 4 11 x 1...

Page 7: ...talling the supply plenum On all installations without a coil a removable access panel is recommended in the outlet duct such that smoke or reflected light would be observable inside the casing to ind...

Page 8: ...ons Bottom Return Bottom return applications normally pull return air through a base platform or return air plenum Be sure the return plat form structure is suitable to support the weight of the furna...

Page 9: ...e into the filter rack and secure it with a sheet metal screw Refer to the unit rating plate for furnace model then see the dimensions page of this instruction for return air plenum dimensions Install...

Page 10: ...earance to the condensate trap and drain pipe A minimum of 8 clearance is required for this purpose NOTE See crawl space installation for suspending the fur nace in attic installations CRAWL SPACE INS...

Page 11: ...s tem by closing its individual external manual shutoff valve during any pressure testing of the gas supply piping system at pressures equal to or less than 1 2 psig 3 48 kpa The furnace and its indiv...

Page 12: ...equip ment ground wire must be connected to the power supply ground Remove the screws retaining the wiring box cover Route the power wiring through the opening in the unit into the junction box with a...

Page 13: ...ri ous accessories Refer to Figure 15 for connection details ELECTRONIC AIR CLEANER CONNECTION The junction box contains a clearly marked wire for connec tion to an electronic air cleaner This wire pr...

Page 14: ...ible from a swimming pool or a location where swimming pool chemicals might be stored Be sure the terminal assem bly follows the outdoor clearances listed in Table 3 for U S installations In Canada re...

Page 15: ...When selecting the location for combustion air vent termina tion the following should be considered 1 Comply with all clearance requirements as listed below 2 Termination should be positioned where ve...

Page 16: ...ation for Additional Clearance FIGURE 21 Vertical Termination OVERHANG 12 MINIMUM VENT MAINTAIN 12 CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER IS GREATER 12 SEPARATION BETWEEN BO...

Page 17: ...brought into the furnace area from outdoors It is not directly ducted into the furnace A single properly sized pipe from the furnace vent connector to the outdoors must be provided For upflow models...

Page 18: ...ed where the equipment has clearances of at least 1 inch from the sides and back and 6 inches from the front of the appli ance The opening shall communicate through a vertical or horizontal duct to th...

Page 19: ...form to ASTM Stan dards D2564 PVC or D2235 ABS 5 The use of flexible connectors or no hub connectors in the vent system is not allowed NOTE If installing furnace at altitudes between 2000 4500 ft inta...

Page 20: ...assembly procedure for the vent piping is as follows 1 Cut piping to the proper length beginning at the furnace 2 Deburr the piping inside and outside 3 Chamfer the outer edges of the piping 4 Dry fi...

Page 21: ...in a downward position Be sure to maintain 12 clearance above any insulation flooring or other COMBUSTION AIR REQUIREMENTS The ventilated attic space from which the combustion air is taken must comply...

Page 22: ...iece of flexible drain tubing such as EPDM rubber Vinyl or PVC to the nipple 5 Loop the drain tubing to provide a trap 6 Connect the discharge end of the drain tube to the con densate disposal system...

Page 23: ...4 PVC or equiva lent pipe be field installed as drain pipe The condensate piping may be tied together with the air conditioning con densate drain if the air conditioning condensate drain line is trapp...

Page 24: ...ration can continue Pressure Switches This furnace is supplied with pressure switches which monitor the flow through the combustion air vent piping system These switches de energize the ignition contr...

Page 25: ...e to call for heat 3 System start up will occur as follows a The induced draft blower motor will start at high speed and wait for low pressure switch contacts to close then switch to low speed and the...

Page 26: ...1 cubic foot dial to make a revolution with only a 120 000 Btuh furnace running Using this information locate 26 seconds in the first column of Read across to the column headed 1 Cubic Foot where you...

Page 27: ...ndant P M solenoids as well as the HI terminal 4 Remove high adjustment seal screw to expose the 3 32 set screw Refer to Figure 36 5 To increase outlet pressure turn the 3 32 set screw clockwise To de...

Page 28: ...may be the same speed or a different speed To use the same speed tap for heating and cooling the heat terminal and cool terminal must be connected using a jumper wire and connected to the desired mot...

Page 29: ...Filter Rack 6 Pack 1BR0317 External Bottom or Horizontal Filter Rack Cabinet B 1BR0321 External Bottom Filter Rack Cabinet C 1BR0324 External Bottom or Horizontal Filter Rack Cabinet D 1NK0301 Condens...

Page 30: ...cooling air flow for 60 seconds with a 15 second coast to stop ADJUSTMENT OF FAN OFF CONTROL SETTINGS This furnace is equipped with a time on time off heating fan control The fan on is fixed at 30 se...

Page 31: ...1350 745 1555 830 1540 860 C B 885 505 1280 700 1430 785 1410 820 B C 655 450 1150 620 1310 740 1300 770 D B 870 460 1230 670 1400 770 1400 800 C A 610 445 1030 555 1220 665 1220 710 D A 715 450 1120...

Page 32: ...t is satisfied the inducer motor is reduced to low speed and the 2nd stage gas valve is de energized to 1st stage The circulator remains on high heat speed for 30 seconds then de energizes to low heat...

Page 33: ...LOW INDUCER LOW STAGE PRESSURE SWITCH HSI 1ST STAGE MAIN VALVE FLAME SENSE LOW CIRCULATOR HEAT SPEED 1ST STAGE LOW PRESSURE SWITCH CLOSE RECOGNITION HSI WARM UP 17 SEC IGNITION ACTIVATION PERIOD 4 SE...

Page 34: ...be sure the filter completely covers the cabinet opening and is secured in place by the wire retainer LUBRICATION Blower and ventor motors in these furnaces are permanently lubricated and do not requi...

Page 35: ...le shooting 1 Check to see that the power to the furnace and the igni tion control module is ON 2 The manual shutoff valves in the gas line to the furnace must be open 3 Make sure all wiring connectio...

Page 36: ...100K ohms by connecting one meter lead to the motor lead and the other to an unpainted portion of the motor housing If any one of the leads fails this test THE MOTOR IS DEFECTIVE AND MUST BE REPLACED...

Page 37: ...ndicate failure status Flash sequence codes 1 thru 4 are as follows LED will turn on for 1 4 second and off for 1 4 second This pattern will be repeated the number of times equal to the code For exam...

Page 38: ...g the call for heat before locking out This may be caused by low gas pressure faulty gas valve faulty hot surface igniter reversed line polarity or burner problem 8 FLASH This fault is indicated if th...

Page 39: ...LACED IT MUST BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 22 1 F 105 HAVING A TEMPERATURE RATING OF AT LEAST 221 C CONNECTIONS SUITABLE FOR COPPER CONDUCTORS ONLY ALL REPL...

Page 40: ...T BE REPLACED WITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 22 1 F 105 HAVING A TEMPERATURE RATING OF AT LEAST 221 C CONNECTIONS SUITABLE FOR COPPER CONDUCTORS ONLY ALL REPLACEMENT COMP...

Reviews: