Several maintenance operations may require the front housing of the unit to be removed.
After having opened up the rear housing of the
ColourCyc 250 LX
as described in section 18, proceed as follows:
1) Loosen the 6 screws (
A
) using an appropriate screwdriver.
2) Rotate and remove the fixing ring.
Attention!
Remove mains power prior to opening up the unit.
The internal temperature of the unit may reach 250° C after 5 minutes, with a peak of 350°C. Ensure that the
lamp is cool prior to removing. The projector should only be opened after it has been allowed to stand and cool
for 10 minutes after is has been turned off.
20. Opening the front of the projector (reserved for technical staff)
English
26