background image

SLEIGH

Assembly Manual

 

- 82028LO 

 

A

N

I

H

C

 

N

E

D

A

M

 

A                                                          0318 TF

N

I

H

C

 

N

D

E

T

N

I

R

P

@2018 Nicolas Holiday Inc., 9F., No. 37, Guangfu N. Rd Taipei, Taiwan 10560. All rights reserved. 

Size:

40 inches

Operating Temperature:

-5

 

to 95

(-20

to 35

)

Application:

Indoor and Outdoor Use

a

b

c

e

d

g

f

A

C

B

1

Parts Included

(A)

(B)

(C)

Half of the sleigh

Connecting Rod

Half of the sleigh

(D)

Accessories (10 Zip ties, 4 Ground Stakes)

To Assemble

1.

Unfold the sleigh from the packaging and set up (Figure 1).

Figure 1

Figure 2

Connecting Rod

2.

Insert all of the connecting rods (Point a, b, c, d, e, f, g) from half of the sleigh to anther one (Figure 2, Figure 3). 

Figure 3

Figure 4

3.

4.

Make sure the location is suitable to install the ground stake when using this item outdoor (Figure 4),

secure sculpture with 4 ground stakes provided.

Plug the tree into a GFCI-protected outlet to turn the tree lights on.

Reviews: