Installation of the ADU (100 cm)
98-175666-A
Chapter 2: Installation
2-20
2.3 Installation of the ADU (100 cm)
The following sections describe the installation and grounding of the ADU. The ADU is
shipped fully assembled. Install it on the mast and attach the ADU cable.
Before installing the ADU read the following guidelines.
2.3.1 To install the ADU
Prerequisites
• Ensure that the crane hook has a closing mechanism to prevent accidental slippage of
the lifting straps.
• Mount the antenna as far away as possible from the ship’s radar and high power radio
transmitters, read more in
Interference from radar, GPS/GNSS, L-band and other
• Install the ADU at a location where
vibrations are limited to a minimum
.
• Make sure that there is sufficient space underneath the ADU to open the service hatch.
WARNING!
Use a strong webbed sling with a belt to lift the ADU without
damaging the radome. Make sure that the sling can carry
105 kg.
WARNING!
The ADU may be subject to swaying motions in windy
conditions. Always use tag lines to stabilize the ADU during
hoisting. It is the crane operator’s responsibility to determine
whether the environmental conditions are suitable for a safe
lift.
Figure 2-20: Use of strong sling with a belt and tag lines for safe hoisting
Webbed sling with belt
Tag lines