Operating instructions
T-Rex N-Serie (Stepper)
CNC-STEP GmbH & Co. KG ▪ Siemensstrasse 13-15 ▪ 47608 Geldern ▪ Germany
Page 61
Support: +49 (0)2831/91021-50
07.03.2022
6 . 3
I n s t a l l a t i o n
6 . 3 . 1
Power up the controller
HINT:
The PC/computer is integrated in the control element.
There is a separate manual for the software itself.
Personal:
•
Professionals
1)
Check all connections for exact fit
2)
Inspection of all EMERGENCY STOP devices
3)
Turn on the main switch
4)
Turn on the control (press the reset button on the control panel) – Chapter 4.4
5)
Starting the Kinetic-NC control software
6 . 4
F i r s t I n s t a l l a t i o n
Personal:
•
Professionals
1
Ensure that the machine is set up and aligned.
2
Ensure that all lines are connected for operational readiness.
3
Ensure that the operator minimum is connected to the machine.
4
Ensure that required accessories are installed and connected to the power supply.
5
Ensure the firm fit of all plug connections.
6
Inspection of safety devices, such as safety fences, etc.