Installation and initial commissioning
6 . 1
S a f e t y i n s t r u c t i o n s f o r i n s t a l l a t i o n a n d i n i t i a l
c o m m i s s i o n i n g
Floating loads
WARNING:
Danger to life due to floating loads!
During lifting operations, loads can swing out and fall. This can cause
serious injuries up to death.
•
Never step under or into the swivel range of suspended loads.
•
Move loads only under supervision.
•
Use only approved hoists and slings with sufficient load capacity.
•
Do not use torn or scrubbed hoists such as ropes and straps.
•
Do not attach hoists such as ropes and straps to sharp edges and
corners, knot and do not twist.
•
Place the load when leaving the workplace.
Improper installation and initial commissioning
WARNING:
Risk of injury due to improper installation and initial commissioning!
Improper installation and initial commissioning can lead to serious injuries
and significant property damage.
•
Ensure sufficient freedom of installation before the start of the work.
•
Handle open, sharp-edged components carefully.
•
Pay attention to order and cleanliness at the assembly site!
Components and tools lying loosely on top of each other or around
are sources of accidents.
•
Professional assembly of components. Comply with prescribed screw
tightening torques.
•
Secure components so that they do not fall or fall over.
•
Before initial commissioning, please note the following:
Ensure that all installation work has been completed and completed in
accordance with the instructions and instructions in this guide.
Ensure that there are no people in the danger zone.