5 Refrigeranting connections
5.1 Pressure Equipment Directive
This unit is a subset: to operate it has to be combined to another unit.
It is an installer responsability:
•
follow the PED Directive and to the national regulations of PED Directive realization
•
consider the insertion of any additional security devices
•
check the safety device operation
•
write on the serial label number the amount of total refrigerant
•
issue the Declaration of conformity
•
inform the user of the need to carry out regular checks
5.2 Vibrations / Noise
The installation of the pipes ma
y aff
ect the level of noise in the system:
•
install fl
e
xible joints between the unit and the pipes
•
Install antivibration material between the brackets and the pipes so as to prevent the transmission of vibrations
•
avoid the passage in particularly silent environments
13
Summary of Contents for MSE-XSC3 100.4
Page 1: ...MSE XSC3 90 4 160 4 Installation and operating manual...
Page 3: ...Index of contents 1 4 2 6 3 8 4 10 5 14 6 18 7 26 8 35 9 47 10 52 11 53 12 54 57 3...
Page 19: ...Connections performed by the Customer 19...
Page 50: ...9 15 Compressor replacement 50...
Page 51: ...9 16 Exchanger replacement 51...