2 Reception
You have to check before accepting the delivery:
•
That the unit hasn’t been damaged during transport
•
That the materials delivered correspond with that indicated on the transport document comparing the data with the identification label
positioned on the packaging.
In case of damage or anomaly:
•
Write down on the transport document the damage you found and quote this sentence: “Conditional acceptance clear evidence of
deficiencies/damages during transport”
•
Contact by fax and registered mail with advice of receipt to supplier and the carrier.
Any disputes must be made within 8 days from the date of the delivery. Complaints after this period are invalid.
2.1 Storage
Observe external packaging instructions.
2.2 Handling
1. Verify unit weight and handling equipment lifting capacity.
2. Identify critical points during handling (disconnected routes, flights, steps, doors).
3. Suitably protect the unit to prevent damage.
4. lifting brackets
5. Lifting with balance
6. Lifting with spacer bar
7. Align the barycenter to the lifting point
8. Use all the lifting brackets (see the dimensional section)
9. Gradually bring the lifting belts under tension, making sure they are positioned correctly.
10. Before starting the handling, make sure that the unit is stable.
Summary of Contents for CKN-XHE2i 10.1
Page 7: ...M06K40A18 00 CKN XHE2i 7 1 14 2 7...
Page 16: ...16 CKN XHE2i 7 1 14 2 M06K40A18 00 6 5 Connections performer by customer...
Page 44: ...M06K40A18 00 CKN XHE2i 7 1 14 2 44 Fans...
Page 45: ...4 CKN XHE2i 7 1 14 2 M06K40A18 00 VALVES Only value 14 2...
Page 51: ...5 CKN XHE2i 7 1 14 2 M06K40A18 00 Flue stack assembly...
Page 53: ...5 CKN XHE2i 7 1 14 2 M06K40A18 00 10 6 Hot water coil...
Page 65: ......