M07J40G8-00
21/07/08
page 11
!
Tree
Consider clearances and direction of expelled air.
Keep the coil clean. Avoid
zones with leaves / dirt /
corrosives.
Avoid snow build-up during
winter operation
!
Provide windbreaks in locations with strong winds.
INSTALLATION OF ANTIVIBRATION MOUNTS
MINIMUM DIMENSIONS
SUGGESTED
CONCRETE FOUNDATION
JACK
PLATE
* UNLOADED HEIGHT
CLAMPS DROWNED IN TH
CONCRETE (NOT SUPPLIE
MINIMUM DIMENSIONS
SUGGESTED
CLAMPS DROWNED IN THE
CONCRETE (NOT SUPPLIED
* UNLOADED HEIGHT
* CONCRETE FOUNDATION
with jack for unit levelling
with supported frame
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html