Clenergy Australia
| 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | [email protected]
Page 15 of 18
7
.
PV Modules Installation
7a. Fix PV panel to T-Rail 110 via
Inter Clamps and End clamps.
Maintain 20mm vertical gap and
20mm horizontal gap between the
two rows.
Use the 6mm Allen (Hex) to tighten
the bolts of the end clamps.
Tip: Use Inter Clamp U18 as the
gap location.
Recommended Torque:
M8:20Nm
7b.The installation is complete.