6
.
T-Rail Installation
6a.
Slide
T-Rails
into
Pre-
assembled rail clamp on Tri-groove
beams and use the 6mm Allen
(Hex) to fasten on another side via
Rail Clamp for T-Rail.
Recommended Torque:
M8:18Nm
Note: Rail clamps can works both
sides with no pre-assembled rail
clamp.
6b. Please determine the necessary
length of T-Rail prior to installation,
if T-Rail isn’t long enough; please
joint two rails via Rail splice as
shown before installing the T-Rail as
directed in step 6a.
Note:
Connecting Rails on Structure
system are not recommended.
6c. Now the Racking System is
completed.