4.1.11  Adjust  the  wind 

deflector  position  so  that  it 

is  in  the  middle  of  the  PV 

module.  Place  the  bolt 

module  into  the  mounting 

slot,  rotate  it  90  degrees 

clockwise  and  make  sure 

it’s in place, and tighten the 

nut, as shown in Fig. 14. 

   

Recommended 

tightening 

torque 

for 

M8 

nut: 

13-14N·m 

 

 

4.1.12 

Tighten 

the 

remaining  bolts  in  the  way 

as  described  above  to 

fasten  the  wind  deflectors, 

as shown in Fig. 15. 

 

 

 

 

 

4.1.13 Attach the grounding 

lug  to  the  frame  of  the  PV 

module.  If  the  PV  array  is 

arranged  in  a  regular  and 

square 

manner, 

the 

grounding  lugs  can  be 

attached to the frame of the 

PV  modules  in  the  first  or 

last row as shown in Fig. 16 

& 17.   

 

 

 

 

 

     

 

 

  Fig. 14 

 

Fig. 15 

 

 

 

   

 

Fig. 16 

 

 

Summary of Contents for PV-ezRack Commercial Tilt

Page 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Page 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Page 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Page 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Page 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Page 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Page 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Page 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Page 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Page 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Page 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...

Reviews: