Avoid working at high temperatures. 

3

Safe Torques 

Please refer to safe torques defined in this guide as shown in the figure below. If 

power tools are required, Clenergy recommends the use of low speed only. High 

speed and impact drivers increase the risk of bolt galling (deadlock). If deadlock 

occurs and you need to cut fasteners, please make sure that there is no load on the 

fastener before you cut it. Avoid damaging the anodized or galvanized surfaces.   

 

Note: Do not fasten bolts tightly until each component is adjusted properly. Repeated 

fastening or unlocking will result in bolt galling / deadlock.

 

3.3 Installation Dimensions   

All drawings and dimensions in this installation guide are for generic reference. The 

PV-ezRack® Commercial Tilt

™ is to be optimized to suit specific conditions for each 

project and documented in engineering drawings. As a result, major components of 

the  PV-ezRack®  Commercial  Tilt

™  may  be provided  in sectional  sizes  and  lengths 

that vary from those shown in this guide. The installation  operations detailed in this 

instruction  guide  remain  the  same  regardless  of  the  component  size.  In  case  you 

need to do any on-site modifications or alteration of the system in a way that would be 

different from engineering drawings, please provide marked up drawings/sketches for 

Clenergy’s review prior to modification for comment and approval. 

Summary of Contents for PV-ezRack Commercial Tilt

Page 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Page 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Page 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Page 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Page 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Page 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Page 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Page 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Page 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Page 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Page 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...

Reviews: