4.1.8 Place the last PV
module in the first row onto
the front and rear legs, with
the frame pressed against
the limiting edges of the
inter clamp and the front
leg. Slide the end clamp
into
place,
check
the
position and then fasten the
end clamp as shown in Fig.
11.
Recommended
tightening
torque
for
M8
bolt:
16-20N·m
4.1.9 Install the remaining
PV modules according to
the above procedure as
shown in Fig. 12.
4.1.10 After all PV modules
are installed properly, place
the wind deflectors on to the
rear legs, overlapping the
neighbouring
wind
deflectors, as shown in Fig.
13.
Fig. 11
Fig. 12
Fig. 13