4.1.8  Place  the  last  PV 

module in the first row onto 

the front and rear legs, with 

the  frame  pressed  against 

the  limiting  edges  of  the 

inter  clamp  and  the  front 

leg.  Slide  the  end  clamp 

into 

place, 

check 

the 

position and then fasten the 

end clamp as shown in Fig. 

11. 

 

Recommended 

tightening 

torque 

for 

M8 

bolt: 

16-20N·m 

 

4.1.9  Install  the  remaining 

PV  modules  according  to 

the  above  procedure  as 

shown in Fig. 12.   

 

 

 

 

 

4.1.10 After all PV modules 

are installed properly, place 

the wind deflectors on to the 

rear  legs,  overlapping  the 

neighbouring 

wind 

deflectors, as shown in Fig. 

13.   

 

 

 

 

 

Fig. 11 

 

 

 

 

Fig. 12 

 

 

 

 

 

 

 

 

Fig. 13 

 

 

 

Summary of Contents for PV-ezRack Commercial Tilt

Page 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Page 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Page 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Page 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Page 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Page 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Page 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Page 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Page 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Page 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Page 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...

Reviews: