2. Installation Tools and Components 

2.1 Tools 

 

 

 

Power Drill (max. torque ≥20N.m, 

for M8 hexagon socket head bolts 

and M8 nuts) 

String 

Torque Wrench 

 

 

 

5m Tape Measure 

Marker Pen 

 

2.2 Components   

 

 

 

 

FL-COMT/W   

COMT Front Leg   

 

 

RL-COMT/W 

COMT Rear Leg   

 

BB-COMT 

Ballast Bar 

WD-COMT 

Wind Deflector 

 

 

 

 

ER-EC-W 

End Clamp 

ER-IC-W   

Inter Clamp     

EZ-GC-C 

Grounding Clip 

EZ-GL-B 

Grounding Lug 

Summary of Contents for PV-ezRack Commercial Tilt

Page 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Page 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Page 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Page 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Page 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Page 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Page 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Page 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Page 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Page 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Page 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...