3 / 10
Clenergy China
Tel86 592 311 0088
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Fac86 592 599 5028
Xiang'an District 361101, Xiamen, Fujian, China
3. System Overview
3.1
Overview of PV-ezRack® Commercial Tilt
™
①
COMT Front Leg
②
COMT Rear Leg
③
Ballast Bar
④
Wind Deflector
⑤
End Clamp
⑥
Inter Clamp
⑦
Grounding Clip
⑧
Grounding Lug
3.2 Precautionary Measures for Stainless-Steel Fastener
Installation
Improper operation may lead to the deadlock of bolts and nuts. Follow the steps below
to reduce this risk.
1
.
Reduce the friction coefficient
(
1
)
Ensure that the thread surface is clean (no dirt or contaminant).
(
2
)
Apply lubricant (grease or 40# engine oil) to fasteners prior to tightening to avoid
galling or seizing in the threads.
2
.
General installation instructions
(
1
)
Apply force to fasteners in the direction of thread.
(
2
)
Apply force uniformly to maintain required torque.
(
3
)
Professional tools and tool belts are recommended.
(
4
)
Avoid using electric tools for final tightening.