background image

 

 

  6 / 10

 

Clenergy China   

 

 

 

 

 

 

                  Tel86 592 311 0088 

999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone   

 

Fac86 592 599 5028 

Xiang'an District 361101, Xiamen, Fujian, China 

 

 

[email protected] 

 

4.1.3  Make  sure  the  size 

and  position  are  correct, 

and  then  place  ballasts  on 

the  ballast  bars,  as  shown 

in Fig. 3. 

 

 

 

Be  sure  to  keep  enough 

space between the ballast 

and the front leg to avoid 

impeding  the  assembling 

due  to  excessively  high 

ballast. 

 

 

When wind deflectors are 

required,  be  sure  to  keep 

enough  space  between 

the  ballast  and  the  rear 

leg, to avoid impeding the 

wind 

deflector 

installation. 

 

 

4.1.4  Place  the  first  PV 

module  on  the  front  and 

rear  legs,  with  the  frame 

pressed against the  limiting 

edge  of  the  front  leg.  A 

distance  of  44mm  shall  be 

kept between the frame and 

the  front  leg  end  and 

between  the  frame  and  the 

rear  leg  end,  as  shown  in 

Fig. 5. 

 

Fig. 3 

 

 

 

Fig. 4 

 

 

 

   

 

Fig. 5 

 

 

 

 

 

 

Summary of Contents for PV-ezRack Commercial Tilt

Page 1: ...PV ezRack Commercial Tilt Installation Guide V1 0 Content 1 Introduction 1 2 Tools Components 2 3 System Overview 3 4 Installation Instructions 5...

Page 2: ...ions and pay attention to other relevant regulations in your local region The latest version of the installation manual is available on our website www clenergy com cn The installer shall comply with...

Page 3: ...energy com cn 2 Installation Tools and Components 2 1 Tools Power Drill max torque 20N m for M8 hexagon socket head bolts and M8 nuts String Torque Wrench 5m Tape Measure Marker Pen 2 2 Components FL...

Page 4: ...Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts Follow the steps below to reduce this risk 1 Reduce the friction coefficient 1 Ensure that the thread surface...

Page 5: ...tly until each component is adjusted properly Repeated fastening or unlocking will result in bolt galling deadlock 3 3 Installation Dimensions All drawings and dimensions in this installation guide ar...

Page 6: ...ten the bolts as shown in Fig 1 Note The distance between the front rear leg end and the ballast bar end shall accord with the dimension indicated on the project drawings Slide the front and rear leg...

Page 7: ...tween the ballast and the front leg to avoid impeding the assembling due to excessively high ballast When wind deflectors are required be sure to keep enough space between the ballast and the rear leg...

Page 8: ...s as shown in Fig 6 Recommended tightening torque for M8 bolt 16 20N m 4 1 6 Slide the inter clamp into the front and rear legs of the first PV module as shown in Fig 7 If grounding installation is re...

Page 9: ...gainst the limiting edges of the inter clamp and the front leg Slide the end clamp into place check the position and then fasten the end clamp as shown in Fig 11 Recommended tightening torque for M8 b...

Page 10: ...rotate it 90 degrees clockwise and make sure it s in place and tighten the nut as shown in Fig 14 Recommended tightening torque for M8 nut 13 14N m 4 1 12 Tighten the remaining bolts in the way as des...

Page 11: ...Zone Facsimile 86 592 599 5028 Xiang an District 361101 Xiamen Fujian China sales clenergy com cn In case of irregular array the grounding lugs shall also be attached to the irregular parts of the arr...

Reviews: