background image

Clenergy Installation Guide_PV-ezRack Ascent  (June 2021)   

Warranty*

12 Year

Worldwide Network

China

Singapore

Philippines

Thailand

Vietnam

Australia

Germany

Japan 

South Korea

Clenergy Australia 

1/10 Duerdin Street, Clayton VIC 3168 Australia

Tel: +61 3 9239 8088 Fax: +61 3 9239 8024

E-mail: [email protected] 

www.clenergy.com.au

Clenergy China

999-1009 Min’an Rd, Huoju Hi-tech Ind. Dev. Zone

Xiang’an District 361101, Xiamen, Fujian, China

Tel: +86 592 311 0088 Fax: +86 592 599 5028

E-mail: [email protected] 

www.clenergy.com.cn

Clenergy EMEA

Esplanade 41, 20354 Hamburg, Germany

Tel: +49 (0) 40 3562 389 00

E-mail: [email protected]

Clenergy Japan

Nittochi Yamashita Building 5th Floor

23 Yamashita-cho, Yokohama, 231-0023 Japan

Tel: +81 45 228 8226 Fax: +81 45 228 8316

E-mail: [email protected] 

www.clenergy.jp

Clenergy Philippines

145 Yakal St., San Antonio village, Makati City, Philippines

Tel: +63 977 8407240

E-mail: [email protected] 

www.clenergy.ph

    

Clenergy Thailand

9/2, 5th Floor, Vorasin Building, Soi Yasoob 2, Viphavadee-Rungsit

Road, Chomphon Sub-district, Chatuchak District, Bangkok 10900

Tel: +66 (0) 2 277 5201, +66 (0) 6 3228-0200

E-mail: [email protected],  [email protected]

www.clenergythailand.com

Clenergy Singapore

24 Raffles Place #28-01 Clifford Centre Singapore 048621

Tel: +65 9873 8286

E-mail: [email protected]

Clenergy Malaysia

Tel: +86 18750231005

E-mail: [email protected]

Clenergy Vietnam

Tel: +65 9873 8286

E-mail: [email protected]

Clenergy Korea

Tel: +65 9873 8286 

E-mail: [email protected]

Summary of Contents for 4X11

Page 1: ...Ascent Installation Guide V1 1...

Page 2: ...d the warranty and invalidate the letter of certification During installation ensure that the self tapping screws and metal screw have sufficient strength and shear force Keep the roof waterproof syst...

Page 3: ...A 50 XXXX 50 GC DT EZ GL B FL AC 10 FL AC 15 SWD AC Socket Wrench MB AC SN WD AC Drive Bit String Marker pen EC M IC M Allen Key 6mm M8 Hexagon Socket Screw M6 M8 Start and End Base L120 End Clamp Int...

Page 4: ...or Side Wind Deflector Angle AL Improper operation may lead to deadlock of Nuts and Bolts The steps below should be applied to stainless steel nut and bolt assembly to reduce this risk 3 2 1 General i...

Page 5: ...m cn 3 2 2 Safe Torques Please refer to safe torques defined in this guide as shown below If power tools are required Clenergy recommends the use of low speed only High speed and impact drivers increa...

Page 6: ...rding to your plan 4 1 2 Lay out the components such as Start and End Base Front Leg and Main Base according to your plan The order of components in each row is 4 1 3 Connect the Base with the Front L...

Page 7: ...Ind Dev Zone Xiang an District 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Install the Rear Leg to the Main Base using the method shown in the right figure...

Page 8: ...e Xiang an District 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Install the Rear Leg Extension to the Rear Leg using the method shown in the right figure And...

Page 9: ...ict 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn 4 4 1 Ballast per rail section Place the ballast centrally on Main Base 4 4 2 Ballast on double brace Place t...

Page 10: ...E sales clenergy com cn 4 5 1 Place the PV modules on the Front and Rear Leg Leave a 20mm gap between PV modules for Inter Clamp 4 5 2 Incline the Inter and End clamp to fit the top channel of Front a...

Page 11: ...hina T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Installation Instruction 4 6 1 Place back Wind Deflectors from left to right on the Main Base Adjacent Wind Deflector are overlapping A...

Page 12: ...v Zone Xiang an District 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Installation Instruction 4 7 1 Place Side Wind Deflector on the Main Base Note Please pa...

Page 13: ...8 2 Grounding Clip Installation Before module and clamps installation it is important to arrange how to position grounding clips to achieve earthing continuity between each PV modules Place the PV mo...

Page 14: ...que middle clamps end clamps Angle AL 4 9 3 Check whether a sufficient weight of ballast has been applied in accordance with your plan 4 9 4 Check all click connections are correctly locked in place 4...

Page 15: ...uilding 5th Floor 23 Yamashita cho Yokohama 231 0023 Japan Tel 81 45 228 8226 Fax 81 45 228 8316 E mail sales clenergy co jp www clenergy jp Clenergy Philippines 145 Yakal St San Antonio village Makat...

Reviews: