Installation Guide_PV-ezRack Ascent-V1.1 (June 2021)
03
page
of 12
Clenergy China
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Xiang'an District 361101, Xiamen, Fujian, China
T
:
+86 592 311 0088
F
:
+86 592 599 5028
E
:
System Overview
3. System Overview
3.1 Overview of PV-ezRack Ascent system
❶
End Clamp
❷
Inter Clamp
❸
Start and End Base L120
❹
Main Base L1500, South-north
❺
Front Leg
❻
Rear Leg 10°
❼
Rear Leg Extension
❽
Wind Deflector
❾
Side Wind Deflector
❿
Angle AL
Improper operation may lead to deadlock of Nuts and Bolts. The steps below should be applied to stainless
steel nut and bolt assembly to reduce this risk.
3.2.1 General installation instructions:
(1) Apply force to fasteners in the direction of thread
(2) Apply force uniformly, to maintain the required torque
(3) Professional tools and tool belts are recommended
(4) In some cases, fasteners could be seized over time. As an option, if want to avoid galling or seizing of
thread, apply lubricant (grease or 40# engine oil) to fasteners prior to tightening.
3.2 Precautions during Stainless Steel Fastener Installation
❶
❹
❽
❼
❿
❾
❻
❺
❸
❷