4.4.1 Ballast per rail section.
Place the ballast centrally on Main Base.
4.4.2 Ballast on double brace.
Place the ballast centrally on Angle AL when
necessary.
Then fasten the nut with a torque of 10 N·m.
4.4 Placing the Ballast
Installation Instruction