4.8.1 Hexagon screw Installation
After the installation of Front Leg and Base, 
fasten Hexagon screws with the holes of front 
leg.

Note: It is required to install two Hexagon 
screws per Front Leg.

4.8.2 Grounding Clip Installation

Before module and clamps installation, it is 
important to arrange how to position grounding 
clips to achieve earthing continuity between 
each PV modules.

Place the PV modules on the Front and Rear 
Leg. 

Incline the Inter and End clamp to fit the top 
channel of Front and Rear Leg.

Slightly lift the PV Module and slide Clamps 
and Grounding Clips into position. The teeth on 
Grounding Clip will automatically align when 
the Inter Clamp is properly installed as shown 
in figures on the right.
 

4.8 Grounding System Installation

Installation Instruction

 Install with Inter Clamp 

Install with End Clamp

Summary of Contents for 4X11

Page 1: ...Ascent Installation Guide V1 1...

Page 2: ...d the warranty and invalidate the letter of certification During installation ensure that the self tapping screws and metal screw have sufficient strength and shear force Keep the roof waterproof syst...

Page 3: ...A 50 XXXX 50 GC DT EZ GL B FL AC 10 FL AC 15 SWD AC Socket Wrench MB AC SN WD AC Drive Bit String Marker pen EC M IC M Allen Key 6mm M8 Hexagon Socket Screw M6 M8 Start and End Base L120 End Clamp Int...

Page 4: ...or Side Wind Deflector Angle AL Improper operation may lead to deadlock of Nuts and Bolts The steps below should be applied to stainless steel nut and bolt assembly to reduce this risk 3 2 1 General i...

Page 5: ...m cn 3 2 2 Safe Torques Please refer to safe torques defined in this guide as shown below If power tools are required Clenergy recommends the use of low speed only High speed and impact drivers increa...

Page 6: ...rding to your plan 4 1 2 Lay out the components such as Start and End Base Front Leg and Main Base according to your plan The order of components in each row is 4 1 3 Connect the Base with the Front L...

Page 7: ...Ind Dev Zone Xiang an District 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Install the Rear Leg to the Main Base using the method shown in the right figure...

Page 8: ...e Xiang an District 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Install the Rear Leg Extension to the Rear Leg using the method shown in the right figure And...

Page 9: ...ict 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn 4 4 1 Ballast per rail section Place the ballast centrally on Main Base 4 4 2 Ballast on double brace Place t...

Page 10: ...E sales clenergy com cn 4 5 1 Place the PV modules on the Front and Rear Leg Leave a 20mm gap between PV modules for Inter Clamp 4 5 2 Incline the Inter and End clamp to fit the top channel of Front a...

Page 11: ...hina T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Installation Instruction 4 6 1 Place back Wind Deflectors from left to right on the Main Base Adjacent Wind Deflector are overlapping A...

Page 12: ...v Zone Xiang an District 361101 Xiamen Fujian China T 86 592 311 0088 F 86 592 599 5028 E sales clenergy com cn Installation Instruction 4 7 1 Place Side Wind Deflector on the Main Base Note Please pa...

Page 13: ...8 2 Grounding Clip Installation Before module and clamps installation it is important to arrange how to position grounding clips to achieve earthing continuity between each PV modules Place the PV mo...

Page 14: ...que middle clamps end clamps Angle AL 4 9 3 Check whether a sufficient weight of ballast has been applied in accordance with your plan 4 9 4 Check all click connections are correctly locked in place 4...

Page 15: ...uilding 5th Floor 23 Yamashita cho Yokohama 231 0023 Japan Tel 81 45 228 8226 Fax 81 45 228 8316 E mail sales clenergy co jp www clenergy jp Clenergy Philippines 145 Yakal St San Antonio village Makat...

Reviews: