Installation Guide_PV-ezRack Ascent-V1.1 (June 2021)
13
page
of 12
Clenergy China
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Xiang'an District 361101, Xiamen, Fujian, China
T
:
+86 592 311 0088
F
:
+86 592 599 5028
E
:
Installation Instruction
4.9.1 Check that the complete system and all components have been installed according to the planning documents and
that there are no deviations.
4.9.2 Check that all hexagon socket screws have been fastened according to the recommended torque (middle clamps, end
clamps, Angle AL).
4.9.3 Check whether a sufficient weight of ballast has been applied in accordance with your plan.
4.9.4 Check all ‘click connections’ are correctly locked in place.
4.8.3 Grounding Lug Installation
It is required to install one Grounding Lug per
row of base. The recommended fasten torque
of the bolt M6*14 is 5~6 N·m.
Fix the Grounding lug on the end of base.
Make sure the inner face of side opening of
Grounding lug is closely attach to the base as
shown in right figure.
Strip earthing cable, insert the conductor into
the Grounding lugs.
Recommended Torque: 5-6N·m
Note: If the earthing cable is less than 4mm,
decrease the Torque to protect it.
4.9 Final Inspection