OPERATORS MANUAL - 4M TRAILED
46
CLAYDON TRAILED 4 METRE
Hybrid Seed Drill
M.3.LFH
Left fert metering unit is
not going around
(Seed & fert drill with 2
motors each driving 2
metering unit)
• Is fert left metering unit rotating
when motor rotates
• Sensor & target functioning and
correct
• PPR value programmed correctly
• Wiring between sensor and
connection box is correct
• Wiring between connection box
and CAN module is correct
• Check sensor on metering unit
M.3.SLH
Left seed metering unit
is not going around
(Drill with 1 motor driving 2
metering units)
• Is seed left metering unit rotating
when motor rotates
• Is drill being operated at ½ width?
• Sensor & target functioning and
correct
• PPR value programmed correctly
• Wiring between sensor and
connection box is correct
• Wiring between connection box
and CAN module is correct
• Check sensor on metering unit
M.3.RSH
Right seed metering
unit is not going around
(Drill with 1 motor driving 2
metering units)
• Is seed right metering unit rotating
when motor rotates
• Is drill being operated at ½ width?
• Sensor & target functioning and
correct
• PPR value programmed correctly
• Wiring between sensor and
connection box is correct
• Wiring between connection box
and CAN module is correct
• Check sensor on metering unit
M.4.S
Motor speed signal from
seed motor not being
received
Motor being operated
and pulses received
from shaft confirmation
sensors but no motor
speed signal
• Signs of mechanical damage to
encoder or cabling on motor
• 3way connector between motor
and harness is correct
• Wiring between 3way connector
and module connector is correct