46
EN
DEX Next S
Note: If you install this instantaneous water heater in exchange for a conventional
instantaneous water heater, there is generally no need to drill holes for the wall brack-
et, in this case step 2 would not be necessary.
Thoroughly rinse the water supply pipes before installation to remove soiling from the
pipes.
1. Using a 12 mm hexagon socket screw key, screw the screw-in nipples into the wall
connections. The seals must be fully screwed into the thread. After tightening, the
double nipples must protrude by 12 – 14 mm.
2. Hold the included mounting template on the wall and align it so that the holes in the
template fit over the double nipples. Mark the drill holes according to the template
and drill them using a 6 mm drill. Insert the included dowels.
3. Pull down the faceplate and unscrew the main hood screw to open the appliance.
4. Loosen the knurled nut to remove the wall bracket and screw the wall bracket to
the wall. Offset tiling or uneven surfaces can be compensated by up to 30 mm with
the aid of the spacers supplied. The spacers are fitted between the wall and the wall
bracket.
5. Installation
Installing the wall bracket
Note: Fasten the screw nuts with caution, to avoid damage to the valves or the piping
system.
• As shown in the illustration, screw the cold water connection piece with the union
nut and the ½ inch seal onto the cold water connection.
• Screw the hot water connection piece with the union nut and the ½ inch seal onto
the hot water connection.
Installing connection pieces
cold
warm
Summary of Contents for 3200-36450
Page 186: ...186 RU DEX Next S C 20 C 60 C 1 C 35 C 43 C 0 5 C 20 C A3 35 C 38 C 40 C 48 C PIN 2 e Paper 60...
Page 187: ...CLAGE 187 RU ECO ECO ECO 2 Automatic OK Duration Start OK 10 Fill Up Start...
Page 191: ...CLAGE 191 RU 2 1 2 3 4 5 10...
Page 194: ...194 RU DEX Next S 3 FX3 AAA...
Page 198: ...198 RU DEX Next S DEX Next S 1 STB SDB...
Page 201: ...CLAGE 201 RU RDX3 36100 IP IP25 IP24 5 RDX3 VDX UDX VDX 34120 RDX RDX3 UDX 34110 RDX RDX3...
Page 202: ...202 RU DEX Next S 2 1 12 12 14 2 6 3 4 30 5...
Page 203: ...CLAGE 203 RU 1 3 1 2 3 5 a 4 5...
Page 204: ...204 RU DEX Next S 6 6...
Page 205: ...CLAGE 205 RU VDE 0100 7 1 2 3 4 5 1 2 5 3 4 3 L2 CLAGE 82250 OK 0 1 2 8 0 1 2 1 35 C 2...
Page 206: ...206 RU DEX Next S A 7 1 6 2 3 4 5 1 S 2 3 4 5 6 7 8 9 IP25 S...
Page 208: ...208 RU DEX Next S EN 60900 55 C 55 C 55 C E1 8 1 2 3 1 4 1 2 3 1...
Page 209: ...CLAGE 209 RU 9 a c b 1 2 3 4 b 5 6 7 8 9 1 2 3 4 5 6 7 8 9...
Page 264: ...264 BG DEX Next S C 20 C 60 C 1 C 35 C 43 C 0 5 C 20 C 35 C 38 C 40 C 48 C 2 E Paper 15...
Page 265: ...CLAGE 265 BG ECO Eco ECO 2 Automatic OK Duration Start OK 10 Fill Up Start...
Page 269: ...CLAGE 269 BG 2 1 2 3 4 5...
Page 272: ...272 BG DEX Next S 3 FX3...
Page 276: ...276 BG DEX Next S 1 DEX Next S STB SDB G...
Page 279: ...CLAGE 279 BG 5 RDX3 VDX UDX RDX3 36100 IP IP25 IP24 VDX 34120 RDX RDX3 UDX 34110 RDX RDX3...
Page 280: ...280 BG DEX Next S 5 2 1 12mm 12 14mm 2 6mm 3 4 30mm...
Page 281: ...CLAGE 281 BG 1 2 3 5 a 4 5...
Page 282: ...282 BG DEX Next S 6 6mm...
Page 283: ...CLAGE 283 BG 1 2 5 3 4 7 VDE 0100 1 2 3 SDB 4 5 STB 3mm C CLAGE 82250 L2 OK 0 1 2 0 1 2 1 35 2...
Page 284: ...284 BG DEX Next S A S 1 S 2 3 4 5 6 7 8 9 IP25 7 1 6 cm 2 3 4 5...
Page 286: ...286 BG DEX Next S EN 60900 1 E1 8 55 C 55 C 55 C 1 2 3 1 4 1 2 3...
Page 287: ...CLAGE 287 BG a c b 1 2 3 4 5 6 7 8 9 1 2 3 4 b c 5 6 7 8 9 9...