31
14
Organize the cables neatly
The system has many cables!
To avoid rattling noise and to have a nice looking
system we recommend you to fasten the cables to
the steel structure with velcro straps.
The main cable routes are:
• From the codec:
• Upward and to the sides
• Downward through the flex tubes (will be
installed later)
• From the amplifier:
• Upward
• From the Ethernet switch:
• Through to the rack cavity and upward
together with the cables from the codec
• To the left and right on top of the cavities
Don't thread cables through the hole at the back
of the rack cavity. This hole should only be used if
you prefer guiding the cables for the table through
the wall, and either over the ceiling or under the
floor, instead of using the flex tubes.
Right power cavity
Left power cavity
Rack cavity