What to do next
To install the front mezzanine module, see
Installing the Front Mezzanine Module, on page 25
Installing the Front Mezzanine Module
Use the following procedure to install the front mezzanine module. This procedure applies to the following
modeules:
• Front mezzanine blank (UCSX-X10C-FMBK)
• Compute Pass Through Controller (UCSX-X10C-PT4F)
• MRAID Storage Controller Module (UCSX-X10C-RAIDF)
Before you begin
To install the front mezzanine module, you need a T8 screwdriver and a #2 Phillips screwdriver.
Cisco UCS X210c M6 Compute Node Installation and Service Note
25
Servicing a Compute Node
Installing the Front Mezzanine Module