Figure 7: Inner-Rail Release Clip
Outer slide rail attached to rack post
3
Inner-rail release clip
1
-
Inner rail attached to server and inserted into
outer slide rail
2
Step 5
(Optional) Secure the server in the rack more permanently by using the two screws that are provided with the slide rails.
Perform this step if you plan to move the rack with servers installed.
With the server fully pushed into the slide rails, open a hinged slam latch lever on the front of the server and insert a
screw through the hole that is under the lever. The screw threads into the static part of the rail on the rack post and prevents
the server from being pulled out. Repeat for the opposite slam latch.
Installing the Cable Management Arm (Optional)
The cable management arm (CMA) is reversible left-to-right. To reverse the CMA, see
Management Arm (Optional), on page 15
before installation.
Note
Step 1
With the server pushed fully into the rack, slide the CMA tab of the CMA arm that is farthest from the server onto the
end of the stationary slide rail that is attached to the rack post. Slide the tab over the end of the rail until it clicks and
locks.
Cisco Application Services Engine Hardware Installation Guide
14
Installing the Server
Installing the Cable Management Arm (Optional)